00196624-04_Service Manual WPC5_6_EN_01-2019.pdf - 第121页
Service Manua l WPC5 / WPC6 Page 4-121 ➢ Fol low the instruction s hown and continue w ith Next . ➢ Place the „ Jig for W PC4-6 base p late “ [03073064- 01] (or a WPTC) ( 1) on the sliding rail of the load axis. ➢ Push…

Service Manual WPC5 / WPC6
Page 4-120
4.1.5 Teaching the Load Axis Offset Point
You only need to teach the offset point if you have changed the zero point position (see "4.1.2
Teaching the Zero Point Position" [
➙
4-115]).
➢ Remove all waffle-pack tray carriers (WPTC) from the WPC.
➢ Select the lifting axis (1).
➢ Select the function
Teach offset load axis
(2).
➢ Select
Next
(3).
➢ Follow the instruction shown and continue with
Next
.

Service Manual WPC5 / WPC6
Page 4-121
➢ Follow the instruction shown and continue with
Next
.
➢ Place the „Jig for WPC4-6 base plate“ [03073064-01] (or a WPTC) (1) on the sliding rail of
the load axis.
➢ Push the gauge into the tower (2).
➢ Make sure that the gauge can be moved along the sliding rail smoothly.

Service Manual WPC5 / WPC6
Page 4-122
➢ Follow the instruction shown and confirm the changes made with
Finish
.