00193733-02.pdf - 第72页
2 Assembly Instructions PCB Camera, Multicolor SIPLACE F5 HM SIPLACE F5 HM 2.8 SITEST: Configuration and Illumination Check of all PC B Cameras Multicolor 05/2 007 Edition 72 : In the conf iguration men u of the gantry ,…

SIPLACE F5 HM 2 Assembly Instructions PCB Camera, Multicolor SIPLACE F5 HM
05/2007 Edition 2.8 SITEST: Configuration and Illumination Check of all PCB Cameras Multicolor
71
2.8 SITEST: Configuration and Illumination Check of
all PCB Cameras Multicolor
DANGER
During the following work, pay attention to the DANGER text regarding work with the SITEST pro-
gram in Abschn. 2.2. 2
2.10.1 Configuration
: Boot the machine and change over into the SITEST program.
: Select "Settings" -> "Machine configuration".
: Select: "PCB camera" -> "Edit" (button).
: The "Edit" window is displayed:
Fig. 2.10.1 "Edit" Window: Selecting the PCB Camera Multicolor
2 Assembly Instructions PCB Camera, Multicolor SIPLACE F5 HM SIPLACE F5 HM
2.8 SITEST: Configuration and Illumination Check of all PCB Cameras Multicolor 05/2007 Edition
72
: In the configuration menu of the gantry, mark the option "Multicolor" and select "Accept" (but-
ton).
: Conduct the illumination check for the PCB cameras Multicolor as described below in Abschn.
2.10.2.
: Exit the menu "Machine configuration" by pressing "Accept".
: Power down the machine and execute a new start so that the configuration will be accepted.
: Next, return to the SITEST program.
: In the main view, press the button "Total reference run".
: Afterwards, conduct the calibration:
Whenever the PCB camera Multicolor is assembled, reinstalled or exchanged, all of the place-
ment heads and cameras must be calibrated - after the overall reference run - as described in
the User Manual SITEST SW V 407.xx.

SIPLACE F5 HM 2 Assembly Instructions PCB Camera, Multicolor SIPLACE F5 HM
05/2007 Edition 2.8 SITEST: Configuration and Illumination Check of all PCB Cameras Multicolor
73
2.10.2 Illumination Check
NOTE:
We recommend that you conduct the illumination check be performed after the PCB camera Mul-
ticolor is assembled, reinstalled or exchanged. By appropriately switching over the vision screen
(see User Manual) it is possible to precisely check the function of the pertinent light level and, for
example, the change from full to one-half brightness. 2
2
: In the SITEST program 407.xx select the ICON "Gantries" and then the "Gantry 1" .
: Click on the CON "PCB camera functions" .
The following screen is displayed:
Fig. 2.10.2 Menu "Setting of Illumination" for PCB Camera"
2
2
2