Overview This chapter outlines a product changeover and setting up on the reel to reel
machine. This must be treated as a guide only, as each reel to reel application
is customer specific and unique.
Product Changeover
1. Ensure there is no screen fitted to the machine.
2. Select Setup Product.
3. Select Load Product.
4. Highlight the correct product file and select Load.
5. Select Back.
6. Select Back.
7. Select Open Cover Commands.
8. Select Print Carriage to Rear.
9. Select Board Clamps to release the board clamps.
10. Open the front cover.
11. On the inroad conveyor, use a 3mm Allen key to loosen/remove (see note
below) the two securing screws that secure the rear product guide.
NOTE
The inroad rear product guide has coarse and fine adjustment. Coarse
adjustment is achieved by removing the guide and refitting the two securing
screws to different holes. Fine adjustment is achieved by loosening the
securing screws and moving the guide on its slots.
12. Place a sample of the product reel against the front product guide and adjust
the rear product guide to approximately 0.5mm of the rear edge of the
Rear Product Guide
Front Product Guide
Securing Screws
Course Adjustment
Hole Positions

USER
SETUP
2.2 Reel to Reel Manual Chapter Issue 3, August 14
product reel. Ensure the sample lays flat with no ripples or creases.
13. Tighten/refit the two adjustment screws.
14. In the tooling area, using a 2.5mm Allen key, loosen the 2 rear rail securing
screws. These can be accessed through a hole in the top of the rear rail.
15. Move the rear rail towards the back of the machine.
16. Lift out the tooling top plate, taking care not to damage the board clamp on
the front rail.
17. Using a flat bladed screwdriver, remove the two sandwich plate securing
screws.
Rail Securing Screw
Rail Securing
Screw
Rear Rail
Top Plate
Securing Screws
Board Clamp
Sandwich Plate
Vacuum Connection
Tooling Table

USER
SETUP
Chapter Issue 3, August 14 Reel to Reel Manual 2.3
18. Lift out the sandwich plate, taking care not to damage the board clamp on
the front rail.
19. Place the replacement sandwich plate on the tooling table, ensure that the
plate is hard against the front rail and the dowel holes are aligned with the
plate below.
20. Refit the two securing screws.
21. There are two dowel holes on the replacement top plate. These align with
dowels on the sandwich plate. Locate the elongated dowel hole.
22. Place the replacement top plate on the sandwich plate, ensuring that the
elongated dowel hole is at the rear and the plate is hard against the front rail.
23. Move the rear rail towards the front of the machine ensuring that it is hard
against the top plate.
24. Tighten the two rear rail securing screws.
25. On the outroad conveyor, use a 2.5mm Allen key to loosen the securing
screw that secures the inner rear transport clamp.
Top Plate
Elongated Dowel Hole
Dowel Hole
Inner Rear Transport Clamp
Outer Rear Transport Clamp
Securing
Screw