Maintenance Manual WPC4, WPC5 and WPC6 Tools and Equipment Maintenance Tools and Equipment Maintenance Manual SIPLACE WPC4, WPC5 and WPC6 9 Maintenance Manual W PC4, WPC5 an d WPC6 2 Maintenance Manual WPC4, WPC5 and WPC…

Introduction
Abbreviations Safety Instructions for Maintenance Tasks
8 Maintenance Manual SIPLACE WPC4, WPC5 and WPC6
Abbreviations
1.2 Abbreviations
Abbreviations Description
CO Component
ESD Electrostatic sensitive device
EMC Electromagnetic compatibility
WPC Waffle pack changer
WPC4 Waffle Pack Changer Version 4
WPC 5 Waffle Pack Changer Version 5
WPC6 Waffle Pack Changer Version 6

Maintenance Manual WPC4, WPC5 and WPC6
Tools and Equipment Maintenance Tools and Equipment
Maintenance Manual SIPLACE WPC4, WPC5 and WPC6 9
Maintenance Manual WPC4, WPC5 and WPC6
2 Maintenance Manual WPC4, WPC5 and WPC6
Maintenance Tools and Equipment
2.1 Maintenance Tools and Equipment
The following list of materials contains all the tools, equipment and materials required for maintaining the
WPC.
Tools and Equipment
2.1.1 Tools and Equipment
Collect the following tools and equipment before you start maintenance work.
Materials
2.1.2 Materials
Collect the following materials before you start maintenance work.
NOTICE
This maintenance manual is based on the WPC4. It is, however, also valid for the WPC5 and
WPC6. Should there be relevant differences for the WPC5 or WPC6 these are described
accordingly in this manual. Most photos and graphics show the WPC4. They are basically valid
for the WPC5 and WPC6 as well.
Tools and Equipment Item number
MATO grease gun, full nozzle stream R1/8 with tube 00384212-xx
17 mm open-ended wrench -
Set of Allen wrenches -
Brush with short bristles -
Materials Item number
Ethanol -
Lint-free cloths -
ISOFLEX TOPAS NCA 52, tin 1kg or
ISOFLEX TOPAS NCA 52, tube 50 g
00328369-xx
00330850-xx
INTERFLON FIN GREASE MP2/3 in 400ml cartridge 03038300-xx
Oil INTERFLON Fin Lube TF 03039002-xx

Maintenance Manual WPC4, WPC5 and WPC6
Maintenance Plan Materials
10 Maintenance Manual SIPLACE WPC4, WPC5 and WPC6
Maintenance Plan
2.2 Maintenance Plan
As the basis for our maintenance intervals, we assume the following machine utilization: eight hours per
shift, three shifts per day, five days a week and four weeks a month.
► Enter the maintenance work performed in the maintenance plan.
► We recommend that you adhere to the order in which maintenance work is performed.
Interval Area Equipment/spare part Performed on
Day - -
Week - -
Month - -
2-
monthly
- -
4-
monthly
Greasing the Linear Guide of the Feed
Axis
Oil INTERFLON Fin Lube TF
Greasing the Linear Guide of the Non-
Stop Module
Oil INTERFLON Fin Lube TF
Year Greasing the Lifting Axis Spindle and
Guidance.
Grease gun, INTERFLON FIN
GREASE MP 2/3
Grease the height adjustment spindle. Brush
Isoflex Topas NCA 52
Clean the feeder axis guidance rails. Lint-free cloths
Clean, grease and check the toothed
belt.
Lint-free cloths , brush, Isoflex
Topas NCA 52, belt tension
measuring device, belt tension
setting gauges
Check the waffle pack trays and clean if
necessary.
Lint-free cloths, ethanol
Check the fiducial. Lint-free cloths, ethanol
Checking the Fan -
Checking Machine Safety -