00193891-0702_AI_LP_Barcode_DE+EN.pdf - 第175页
SIPLACE 2 PCB barcode scanner assembly instructions 10/2009 Edition 2.7 Installing the PCB barcode scanner 175 : S tick the distributor rail (SC) or both distributor rails ( DC) inside the drawer unit (see photo - graph …

2 PCB barcode scanner assembly instructions SIPLACE
2.7 Installing the PCB barcode scanner 10/2009 Edition
174
: Set the relevant switch for the connected scanner to OFF and the others to ON.
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2

SIPLACE 2 PCB barcode scanner assembly instructions
10/2009 Edition 2.7 Installing the PCB barcode scanner
175
: Stick the distributor rail (SC) or both distributor rails (DC) inside the drawer unit (see photo-
graph below).
: Connect the grounding cable for the distributor rail to the available grounding point.
Th
e grounding cable must be connected with plai
n washer, snap ring and nut M5.
Grounding
Distributor rails
HS-50 single conveyor
Grounding
Distributor rail
HS-50 dual conveyor
Grounding
2
2
: Fit the cover to the conveyor control.

2 PCB barcode scanner assembly instructions SIPLACE
2.7 Installing the PCB barcode scanner 10/2009 Edition
176
: Fix the cables using cable ties.
2
: Open the panel on the left-hand side of the input extension kit.
: Remove the cover from the conveyor control and connect the cable to X 23 and X24.
2
Fig. 2.7 - 5 HS-50 conveyor controller
2
The jumper assignment for the interface (SIPLACE / SMEMA) on the conveyor control must cor-
respond to the current interfaces otherwise the barc
ode data will not be forwarded correctly to the
station software. 2
J1 = SIPLACE/SMEMA upstr
eam station
J2 = SIPLACE/SMEMA downstream station
SIPLACE = setting 1-2; SMEMA setting 2-3. 2
2
2
2
2
2
2
2