QLF08_LaBel.pdf - 第9页
IC and Component Selection for Space Sy stems – Presented by Kenneth A . LaBel 9 Risk Requirements • Rationale – T rying to ensure mission parameters such as reliability , availability , operate-through, and lifetime are…

IC and Component Selection for Space Systems – Presented by Kenneth A. LaBel
8
Programmatic Requirements and
Considerations
• Rationale
– Trying to keep a program on schedule
and within budget
• Personnel involved
– Project manager, resource analyst,
system scheduler
• Usual method of requirements
– Flowdown from parent organization
or mission goals for budget/schedule
• I.e., Launch date
• Buzzwords
– Cost cap, GANTT/PERT chart, risk
matrix, contingency
• Limiting factors
– Parent organization makes final
decision
Programmatics
A numbers game

IC and Component Selection for Space Systems – Presented by Kenneth A. LaBel
9
Risk Requirements
• Rationale
– Trying to ensure mission parameters such as reliability,
availability, operate-through, and lifetime are met
• Personnel involved
– Radiation engineer, reliability engineer, parts engineer
• Usual method of requirements
– Flowdown from mission requirements for parameter space
• I.e., SEU rate for system derived from system availability specification
• Buzzwords
– Lifetime, total dose, single events, device screening, “waivers”
• Limiting factors
– Management normally makes “acceptable” risk decision

IC and Component Selection for Space Systems – Presented by Kenneth A. LaBel
10
An Example “Ad hoc” Battle
• Mission requirement: High resolution image
– Flowdown requirement: 14-bit 100 Msps ADC
• Usually more detailed requirements are used such as
ENOB or INL or DNL as well
– Designer
• Searches for available radiation hardened ADCs that
meet the above requirements
• Searches for commercial alternatives that could be
upscreened
– Manager
• Trades the cost of buying Mil-Aero part requiring less
aftermarket testing than a purely commercial IC
• Worries over delivery and test schedule of the candidate
devices
– Radiation/Parts Engineer
• Evaluates existing device data to determine reliability
performance and additional test cost and schedule
• The best device? Depends on mission priorities