4OM-1610 1-16 3. Maintenance Spots : Chap.1 Nozzle Stocker Section Head Section XY Beam Section Component Recognition Camera Section Cutter Section Feeder Base Driving Section Cart Installation Section Nozzle Stocker Sec…

100%1 / 339
4OM-1610
1-15
3. Maintenance Spots : Chap.1
3. Maintenance Spots
3.1 Whole View
Notice
Any operations with a cover(s) being removed are included.
After the maintenance work, be sure to attach the cover.
Feeder Cart Section
Air Source
Vacuum System
Front View of Machine
F4A6
Reference
(a) Refer to "3.2" in "Chapter 1" and the subsequent items for the detailed
information on the spots of each section to be maintained and how to
maintain them.
(b) As for the options, refer to each instruction manual of the specially
specied devices for the maintenance.
1011-002
4OM-1610
1-16
3. Maintenance Spots : Chap.1
Nozzle Stocker Section
Head Section
XY Beam Section
Component Recognition
Camera Section
Cutter Section
Feeder Base Driving Section
Cart Installation Section
Nozzle Stocker Section
PCB Transfer Section
PCB Transfer Section
(Front Side of Machine)
F4A7
0911-001
4OM-1610
1-17
3. Maintenance Spots : Chap.1
1011-002
3.2 Inspection, Cleaning, and Lubrication Spots
The following describes about the maintenance tasks required for each individual
units.
Reference
Refer to "2. Maintenance Check List" in "Chapter 1" for the maintenance items
classied based on frequency.
3.2.1 Air Source
Main Air Pressure
2
)
Every Day Inspection
Required Time: 1 minute
Set Air Pressure 0.45 MPa (4.6 kgf/cm
Check to see that the air pressure is
"Min. 0.4 MPa (4.1 kgf/cm
2
)" while the
machine is running.
If not, adjust the air pressure.
Air Blowing Pressure
Every Day Inspection
Required Time: 1 minute
Check to see that the pressure gauge reads
the initial setting (0.05 MPa (0.5 kgf/cm
2
)).
Do not change the pressure unless
necessary. The pressure is factory-adjusted
upon shipment of the machine.
Z Clamp Pressure
Every Day Inspection
Required Time: 1 minute
Check to see that the pressure gauge reads
the initial setting (0.4 MPa (4.1 kgf/cm
2
)).
Do not change the pressure unless
necessary. The pressure is factory-adjusted
upon shipment of the machine.
Drain
Drain
Every Week Cleaning
Required Time: 5 minutes
Prepare a container and pull down the
black cap each on the filter case lower
section to drain.
F4A8