00191376-07.pdf - 第42页
7 4-monthly maintenance jobs HS Preventive Maintenance 01/2006 US E dition 42 7 4-monthly maintenance jobs 7.1 S tructure of the 12-segm ent Collect&Place he ads DLM1 (HS-50) and DLM 2 (HS-60) 7 Fig. 7.1 - 1 12-segme…

HS Preventive Maintenance 6 2-monthly maintenance jobs
01/2006 US Edition
41
a Preserve the feeder area using a lint-free cloth sprayed with WD40.
s Vacuum up any loose components from the tape container and remove any unwanted stickers
and adhesive tape.
6
d Cut off the excess used tape flush with the feeder and empty the component drawer or the
component flap on 8 mm S feeders.
: Return the feeders to the feeder area.
Make sure that each feeder is in the correct location and is connected correctly. 6
6
6
6
6
6
: Close the protective cover.
: Switch the placement machine on at the main switch.
: Repeat these tasks in every placement area.
6
6
6
6
6
6

7 4-monthly maintenance jobs HS Preventive Maintenance
01/2006 US Edition
42
7 4-monthly maintenance jobs
7.1 Structure of the 12-segment Collect&Place heads
DLM1 (HS-50) and DLM 2 (HS-60)
7
Fig. 7.1 - 1 12-segment Collect&Place heads
7
7
7
7
7
7
7
7
DLM 1
DLM 2

HS Preventive Maintenance 7 4-monthly maintenance jobs
01/2006 US Edition
43
7
You will need the following tools, equipment and consumables for the 4-monthly maintenance. 7
–Pliers
– Short-bristled brush
– Set of hexagon socket spanners
– Lint-free cloths
– Lint-free cottonwool buds
– Ethyl alcohol
– ISOFLEX TOPAS NCA52 grease
– UNISILKON L250L
– Oil dispenser with Structovis GHD (DLM1)
– New distributor plate, if required (DLM 1)
– New Z axis toothed belt, if required
– New distributor, if required
– New O-ring, turning station, if required
– New toothed belt for the turning station, if required.
– Set of cleaned sleeves
– Set of clean valve plungers
7
7
7
7
7
7