00191376-07.pdf - 第43页
HS Preventive Maintenance 7 4-monthly m aintenance jobs 01/2006 US Edition 43 7 Y ou wil l need the following tools, eq uipmen t and cons umables for the 4-m onthly ma intena nce. 7 –P l i e r s – Sho rt-b rist led br us…

7 4-monthly maintenance jobs HS Preventive Maintenance
01/2006 US Edition
42
7 4-monthly maintenance jobs
7.1 Structure of the 12-segment Collect&Place heads
DLM1 (HS-50) and DLM 2 (HS-60)
7
Fig. 7.1 - 1 12-segment Collect&Place heads
7
7
7
7
7
7
7
7
DLM 1
DLM 2

HS Preventive Maintenance 7 4-monthly maintenance jobs
01/2006 US Edition
43
7
You will need the following tools, equipment and consumables for the 4-monthly maintenance. 7
–Pliers
– Short-bristled brush
– Set of hexagon socket spanners
– Lint-free cloths
– Lint-free cottonwool buds
– Ethyl alcohol
– ISOFLEX TOPAS NCA52 grease
– UNISILKON L250L
– Oil dispenser with Structovis GHD (DLM1)
– New distributor plate, if required (DLM 1)
– New Z axis toothed belt, if required
– New distributor, if required
– New O-ring, turning station, if required
– New toothed belt for the turning station, if required.
– Set of cleaned sleeves
– Set of clean valve plungers
7
7
7
7
7
7

7 4-monthly maintenance jobs HS Preventive Maintenance
01/2006 US Edition
44
7