2OM-1086-002.pdf - 第353页

0509-001 Chapter 3 1 - 49 Tg0583-PM-D2

100%1 / 455
0211-005 Chapter 3 1-48 Tg0583-PM-D2
13. Cleaning Procedure of Cleaning Unit
(11) Tighten the five bolts fastening the cleaning rubber squeegee and
attach the cleaning rubber squeegee and the mounting plate. See
the note below.
Attach the cleaning rubber squeegee while pushing it against a
flat surface such as a surface plate such that it touches the
cleaning paper equally.
The bolts fastening the cleaning rubber squeegee must be tight-
ened gradually and additionally until the following torques are
applied.
Bolt Tightening Torques
Bolts at Both Ends : Approx. 10 kgf/m
Other Bolts : Approx. 15 kgf/m
(12) Attach the squeegee block and the cleaning nozzle with the corre-
sponding bolts.
0509-001 Chapter 3 1-49 Tg0583-PM-D2
Section 2
Consumables and Servicing Parts
0211-005 Chpter 3 2-1 Tg0583-PM-D2
This section lists up the consumables and servicing parts.