Test Research, Inc . 5 TR7600 SIII Ser ies User G uide – Installa tion 5) Release the s crews of the left wall, lift the w all, and remove the wall horizontally. Figure 6: Remove Other Walls in Sequence 6) After all w al…

Test Research, Inc.
TR7600 SIII Series User Guide – Installation 4
3) Release screws at the front wall of the container, lift the wall, and then remove the wall
horizontally.
Figure 4: Remove the Front Wall
4) Remove other walls in a clockwise sequence.
Figure 5: Remove Other Walls in Sequence

Test Research, Inc.
5 TR7600 SIII Series User Guide – Installation
5) Release the screws of the left wall, lift the wall, and remove the wall horizontally.
Figure 6: Remove Other Walls in Sequence
6) After all walls have been removed, remove the packing materials.
7)
Loosen the two lashing straps.
Figure 7: Remove the Two Lashing Straps

Test Research, Inc.
TR7600 SIII Series User Guide – Installation 6
8) Before deploying the fork lift, you can bend the protruding steel eyelet shown below to
horizontal position using a hammer so that you can move out the machine easily.
Figure 8: Bend the Steel Eyelet Horizontally
9) Remove the inner packing materials.
Figure 9: Remove the Inner Packing Materials