37 5.2 Overha ul Project and Cycle In order f or the robot to maintain high per form ance f or a long tim e, a maintenan ce c heck must be c arried out. The person in charge of ov erhaul m ust prepare an overhaul plan an…

37
5.2 Overhaul Project and Cycle
In order for the robot to maintain high performance for a long time, a maintenance check must be carried
out. The person in charge of overhaul must prepare an overhaul plan and carry out an inspection. Please refer
to the table below for overhaul items.
In addition, overhauls are required every 20,000 hours of operation time or every 4 years. If you are not
clear about the maintenance processes, please contact our service department.
Cycle
Overhaul Items Overhaul essentials Part
daily 3month Every year
Robot body
confirm that whether the stored
location of the program is deviated
All Parts
Cleaning the
robot body
Wipe off dirt, etc., remove
accumulated spatter, ash, dust,
cutting residue, etc.
All Parts
Main bolts
All the bolts exposed on the
outside of the robot need to be
tightened and marked (see the
specified tightening torque table),
including the tool mounting bolts
are also implemented.
All Parts
Motor
Abnormal heating or sound
confirmation
All Axis
Brake
Check when the servo power
is turned ON/OFF, whether the
robot arm or tool will fall.
All Axis
Reducer
Check for abnormal vibration, noise,
and oil leakage
All Axis
Tools
Apply force to the tool to make sur
e
it is properly and securely bolted in
place.
The 6th Axis
Bolted tightening torque table
Bolt Size Hexagon bolt SUS bolt with hexagon hole
M3 2.4 Nm 1.47 Nm
M4 5.4 Nm 3.4 Nm
M5 9 Nm 6.9 Nm
M6 15.3 Nm 11.8 Nm
M8 37 Nm 28.4 Nm
The tightening torques will vary depending on the type of base metal or bolt. When not
specified, please follow the tightening torques above.
JAKA Zu 7 v2.5

38
Verification
number
Inspection cycle Maintenance
Inspecting
Parts
Inspecting Content
Inspection/process
ing method
Daily
Every 3
months
Every 1
year
4 year
5 year 8 year
1 Surfaces
Whether there is
splashes, dust, etc.
Visual confirmation,
cleaning
2 Filters
Whether there is dirt or
blockage
Visual confirmation,
cleaning, replacement
3
Cables
Confirm whether there
is any damage or
fragmentation
•Confirm whether the
connectors are loosed.
Visual confirmation,
tightening. Replace the
cable when it is
obviously damaged.
4 Overhaul
(P.S.) Use a soft cloth to remove dusts when cleaning. Do not blow off dust with equipment such as air
blowers. Wind pressure will cause the dusts to enter the inside of the fan and the blades rotate at a speed
exceeding the rated speed, which may cause the fan to malfunction or affect its life. Only use the vacuum
cleaner on the blade section. Do not vacuum the rotating part or the main body, which can cause the fan to
malfunction or reduction of the fan’s service life.
5.3 Parts Replacement and Preservation
When replacing the parts of the robot control unit, please observe the following precautions and work
safely.
1、 Do not carry out any modification of our products.
2、 Fire, malfunction, and wrong movements caused by modification may result
in personal injury or damage to the robot.
3、 Any loss caused by the user's own modification of JAKA's products is not
covered by JAKA’s warranty.
1、 To prevent electric shock, when replacing parts, please turn off the circuit
breaker, and then turn off the main power supply.
1. Turn off the main power, wait for 5 minutes, and then the parts could be
replaced if needed.
2. There is a risk of electric shock, due to residual charge in the electronic
components.
3. Do not use wet hands for work.
4. In case of electric shock, it will result in serious injury or death.
1. 1.The replacement must be carried out by the specified operator.
2. 2.Electric shock or being caught by a robot accidentally can result in serious
injury or death.
JAKA Zu 7 V2.5