00196849-02 OG SIPLACE Operation of X and SX-Series without SSC (SW70x).pdf - 第191页

Weekly PM (70x) - Vacuum Checks and Height Reference Run : 191 Vacuum Ch ecks and Height Reference R un 1. Pick up the nozzles for all heads from the nozzle changers. 2. Make a vacuum test for all heads. If there are any…

100%1 / 200
Weekly PM (70x) - Last Cleaning Tasks :
190
Last Clean ing Tasks
1. Clean the outside of the machine covers using large
lint free cloths.
2. Ensure that the machine working area is clear and
that no tools or materials have been left inside.
3. Close the machine safety covers.
4. Press the start button and the gantries should return
to their last positions.
Weekly PM (70x) - Vacuum Checks and Height Reference Run :
191
Vacuum Ch ecks and Height Reference R un
1. Pick up the nozzles for all heads from the nozzle
changers.
2. Make a vacuum test for all heads.
If there are any problems with the test contact your
supervisor.
3. Click ‘Head Nozzle Offset’ icon / button to make a
height reference run for all heads.
Should any nozzles fail the test check that they a seated
correctly and then repeat the test. If the failure is
repeated contact your supervisor.
Weekly PM (70x) - Nozzle Centering for C&P 20 heads. :
192
Nozzle Centering for C&P 20 heads.
1. Select the button / icon ‘All nozzles’.
2. Select the button / icon ‘Center’.
3. The head will now perform this task.
Repeat this function for all C&P20 heads.
If any errors occur during this procedure contact your
supervisor.