00196849-02 OG SIPLACE Operation of X and SX-Series without SSC (SW70x).pdf - 第8页
8 Inhaltsverzeichnis 9.1 Option WPC 105 9.2 Condition Of The Carrier 106 9.3 Number ing System Of Level 107 9.4 Removal Of Carrier 108 9.5 Loading Of Carrier 109 9.6 Correct placement o f Carrier in Un it 110 9.7 Loading…

Operator Guide SIPLACE Operation of X and SX-Series with SSC
Inhaltsverzeichnis
7
7.10 Nozzle changer setup is complete. 88
8 SW 703 Option MTC 89
8.1 Option - MTC 89
8.2 Numbering System Of Levels (Towers 1 & 2) 90
8.3 Numbering System Of Levels (Towers 1 & 2) 91
8.4 Removal Of Carriers for both Towers 92
8.5 Loading Of Carrier for both Towers 93
8.6 Loading Position Of The Carrier (Tower 1) 94
8.7 Loading Position Of The Carrier (Tower 2) 95
8.8 Magnets Under The Carrier 96
8.9 Locking Of The Leaf Springs (Towers 1 & 2) 97
8.10 Filling MTC 98
8.11 Set Up Sheet for MTC 99
8.12 Filling the MTC 100
8.13 Moving to the Refill position 101
8.14 Refilling the Trays 102
8.15 Refill Completed 103
8.16 Checklist for MTC Preparation. 104
9 SW 703 Option WPC 105

8
Inhaltsverzeichnis
9.1 Option WPC 105
9.2 Condition Of The Carrier 106
9.3 Numbering System Of Level 107
9.4 Removal Of Carrier 108
9.5 Loading Of Carrier 109
9.6 Correct placement of Carrier in Unit 110
9.7 Loading Position Of The Carrier 111
9.8 Magnets Under The Carrier 112
9.9 Filling the WPC 113
9.10 Filling the WPC 114
9.11 Filling the WPC 115
9.12 Setup Sheet for WPC 116
9.13 Filling the WPC 117
9.14 Filling the WPC. 118
9.15 WPC fill completed. 119
9.16 WPC fill completed. 120
9.17 Checks when loading the WPC. 121
10 SW 703 Prepare the line – Important Factors 123
10.1 Most Important Factors for Prepare the Line 123
10.2 DPM,MFR, Scrap Rate 124

Operator Guide SIPLACE Operation of X and SX-Series with SSC
Inhaltsverzeichnis
9
10.3 Important Factors for Prepare the Line 125
10.4 Reject Rate 126
11 703-GUI Overview 127
11.1 PCB Information 127
11.2 PCB being Processed - Running Mode 128
11.3 Light Towers 129
12 Refilling Component Reels 131
12.1 Checking the Component Reels 131
12.2 Splicing - Required Tools and Materials 132
12.3 Preparation of carrier tape end 133
12.4 Preparation of new carrier tape 134
12.5 Splicing the carrier tape 135
12.6 Splicing the carrier tape 136
12.7 Splicing of wide carrier tapes 137
12.8 Checking the splice 138
12.9 After Splicing 139
12.10 Cleaning Tasks 140
13 703 Running the line – Important Factors 141