T ransfer & Installation Pr ocedur e 3-15 Referen ce Ra ting Input volt age : 3 phase AC 200 ± 18V / 208 ± 19V / 220 ± 20V / 240 ± 22V / 380 ± 25V / 415 ± 28V, 50/60 Hz  Powe r c onsum ption: 4.7 KVA  Grounding : B…

100%1 / 24
Advanced High Speed Flexible Mounter
3-14
5. Check the input of the transformer of the machine and set the input power according to the
voltage applied to the machine installation site.
Caution
If the input voltage of the transformer was changed, the
power sticker attached on the machine must be changed
according to the changed voltage. Mark the power supply
on the S/N nameplate in oil magic ink. Otherwise, the
machine may be damaged due to the input of incorrect
power supply.
Warning
If the voltage of the local power supply is unavailable at
the input
terminal of the transformer, perform setup with an input port whose
voltage is one step higher than that of the local power supply (Ex: if the
input voltage of the local power supply is 3 phases and 400V, perform
setup of the transformer input power cable with 415V port).
6. When input voltage setup is completed, assemble the cover (in the reverse order of
disassembly) and connect the main power cable to the main power supply connector on the rear
side of the machine.
Transfer & Installation Procedure
3-15
Reference
Rating Input voltage: 3 phase AC 200±18V / 208±19V / 220±20V /
240±22V / 380 ±25V / 415±28V, 50/60 Hz
Power consumption: 4.7 KVA
Grounding: Based on 3rd class grounding, the Mega Test
value shall be less than 100 Ω between the ground wire and
the machine.
AVR: The AVR is a basic option. It is recommended to have
the capacity margin at more than 20%.
Caution
When single phase current is taken off from the 3 phase
cur
rent, it is
desirable to use 40% of the total capacity (kW) as single phase current in
order to prevent the machine from being damaged due to distortion
caused by the trip.
7. The machine must be grounded with peripheral machine by using the FG terminal immediately
below the main power supply connector.
Connect the peripheral
equipment including tray
feeder to the FG terminal..
Advanced High Speed Flexible Mounter
3-16
3.1.7. Motor I/O Check
3.1.7.1. Procedure
1. Before turning on the main circuit breaker, check again to determine if there is any obstacle
inside the machine or on the conveyor.
2. If the area surrounding the machine is clear, turn on the main switch of the machine. At this
time, check if the front and rear emergency switches are released and the front and rear doors
are closed.
Caution
If the power supply and internal of the machine are not
checked before
turning on the main switch, the machine may be damaged or personal
injury may occur. Be sure to check inside and outside of the machine
before turning on the main switch.
3. If the MMI program is loaded, the I/O of the motor must be checked without pressing the
<Ready> switch on the Front OP Panel. Check if the +/- limit sensor and home sensor operate
normally for each motor by sensing the sensors manually. At this time the XY axes can be
moved manually without difficulty.