ASM贴片机CPP头半年保养.pdf - 第14页

在线预览 ASM贴片机CPP头半年保养.pdf PDF 文档。

100%1 / 70
3 6-monthly CPP Remove the holding circuit 2 min 1 / 1
CAUTION!Refer to safety instructions in user manual before commencing Mainten-
ance
NOTICE! ESD guidelines are to be followed Tool:
T13, T21, T44, T76
Wear Part: Consumables:
1 Proceed with the head stand flat on the
table.
2 Loosen the fixing and take out the
screwed joint.
3 Take out the holding circuit housing to-
gether with the silencer.
4 Pay attention not to damage the flex
cables while removing the holding circuit
in the next step.
5 Loosen the 6 screws fixing the holding cir-
cuit.
6 Insert the screwed joint by two turns and
remove the holding circuit to clean it in the
ultra sonic bath. See appendix "Maintain
the holding circuit".
4 6-monthly CPP Exchange / maintain the PRV 2 min 1 / 2
CAUTION!Refer to safety instructions in user manual before commencing Mainten-
ance
NOTICE! ESD guidelines are to be followed Tool:
T12, T47, T79
Wear Part: Consumables:
1 Put the front plat flate on the table with the
race way pointing down.
2 Take out both fixing screws. 3 Unscrew the cable clamp.
4 Press the two clips at the side and discon-
nect the ribbon cable.
5 Unscrew both screws and take the mount-
ing plate away.
6 Exchange the PRV with a maintained one.
See appendix "Maintain the PRV".