ASM贴片机CPP头半年保养.pdf - 第52页
在线预览 ASM贴片机CPP头半年保养.pdf PDF 文档。

19 6-monthly CPP Finish the head maintenance 1 min 1 / 1
CAUTION!Refer to safety instructions in user manual before commencing Mainten-
ance
NOTICE! ESD guidelines are to be followed Tool:
T3, T7, T8, T9, T21, T42, T58
Wear Part: Consumables:
C3, C5, C21
1 Remove the maintenance label. 2 Clean the area of the label. 3 Write the maintenance date onto a new la-
bel and attach it to the head.
4 Remove the 2 screws to take the head
from the head stand.
5 Place the head into the transport con-
tainer.


20 6-monthly CPP Appendix: Maintain the holding circuit 45 min 1 / 2
CAUTION!Refer to safety instructions in user manual before commencing Mainten-
ance
NOTICE! ESD guidelines are to be followed Tool:
T22, T38, T57, T92
Wear Part:
W29
Consumables:
C5, C19, C22, C24, C31, C45
1 Remove the bottom seal. 2 Remove the top seal. 3 Clean the holding circuit from rough pollu-
tion.
4 Put the holding circuit into the ultrasonic
bath. Cleaning liquid = 5% C24 and 95%
C45, temp = 50°C, time = 30min.
5 Prepare the multipette. See appendix
"Prepare the multipette".
6 When finished rinse all holes from the top
using a complete filling.