Preventive Maintenance CPP
SIPLACE Job Card
Edition 10/2016 EN
All names identified by ® are registered trademarks of ASM Assembly Systems GmbH & Co. KG. The remaining trademarks in this publication may be trademarks whose use by third parties
for their own purposes could violate the rights of the owner.
We have reviewed the contents of this publication to ensure consistency with the hardware and software described. Since variance cannot be precluded entirely, we cannot guarantee full
consistency. However, the information in this publication is reviewed regularly and any necessary connections are included in subsequent editions.
Copyright © ASM Assembly Systems Technical data subject to change
ASM
Assembly Systems GmbH & Co. KG
Rupert-Mayer-Strasse 44
81379 München
Germany
Item no.: 00197503-02
www.asm-smt.com Printed by ASM Assembly Systems
Equipment required for CPP head maintenance (6-monthly)
1 Mount the CPP head
2 Dismantle the front plate
3 Remove the holding circuit
4 Exchange / maintain the PRV
5 Lubricate the Z-axis support roller
6 Clean / lubricate the Z-axis linear guide
7 Clean / lubricate the DP segment guide
8 Clean / lubricate the DP drive bearing
9 Check / replace the hoses at DP drives
10 Clean the DP light barrier
11 Mount the holding circuit
12 Clean the holding circuit housing and replace / mount the silencer
13 Clean / mount the screwed joint
14 Mount the front plate
15 Lubricate the star bearing
16 Replace the filter discs
17 Mount the PRV
18 Clean the component sensor
19 Finish the head maintenance
20 Appendix: Maintain the holding circuit
21 Appendix: Maintain the Pressure Regulator Valve (PRV)
22 Appendix: Prepare the multipette
23 Appendix: Clean-up the multipette