ASM贴片机CPP头半年保养.pdf - 第47页
17 6-monthly CPP Mount the PRV 3 min 1 / 1 CAUTION!Refer to safety instructions in user manual before commencing Mainten- ance NOTICE! ESD guidelines are to be followed Tool: T21, T47, T78 Wear Part: Consumables: 1 Proc…

16 6-monthly CPP Replace the filter discs 3 min 2 / 2
CAUTION!Refer to safety instructions in user manual before commencing Mainten-
ance
NOTICE! ESD guidelines are to be followed Tool:
T21, T37, T47
Wear Part:
W7, W16
Consumables:
7 Repeat step 4 to 6 for all segments. 8 Mount all nozzles.

17 6-monthly CPP Mount the PRV 3 min 1 / 1
CAUTION!Refer to safety instructions in user manual before commencing Mainten-
ance
NOTICE! ESD guidelines are to be followed Tool:
T21, T47, T78
Wear Part: Consumables:
1 Proceed with the head stand flat on the
table.
2 Plug in the hoses at the pressure regulator
valve.
3 Plug in the hose at the screwed joint.
4 Mount the PRV to the front part. NOTE the
different length of screw (1) and screw (2).
5 Tighten both screws with a torque of 0,9
Nm.
6 Press the two clips at the side and con-
nect the ribbon cable properly.
