SM482PLUS_Maintenance(Eng_Ver2.7).pdf - 第30页

Chap ter 2 Inspe ction It ems fo r Main t e nanc e Multi -Func tional Placer SM482PLUS Maintenance Handbo ok 2-5 Monthly Inspections (1/2) Che ck-up List Maint enance Cycl e Referen ce Time requ ired Per iod No Inspectio…

100%1 / 78
Chapter 2
Inspection Items for Maintenance
Multi-Functional Placer
SM482PLUS Maintenance Handbook
2-4
Weekly Inspections
Inspection Items for Maintenance
Chapter 2
Inspection Items for Maintenance
Multi-Functional Placer
SM482PLUS Maintenance Handbook
2-5
Monthly Inspections (1/2)
Check-up List
Maintenance
Cycle
Reference
Time
required
Period No Inspection Item Measures Tools
Monthly
M-1 Head Spindle Clean
Cleaning liquid, Air gun, Ultra
fine fiber cloth
30 Minutes
M-2 Conveyor Sensor / Fiducial Mark Inspect and clean
Cleaning liquid, Cotton Swab,
Ultra fine fiber cloth
10 Minutes
M-3 Cover Cooling Fan Inspect and clean
Crosshead screwdriver,
Vacuum cleaner
10 Minutes
M-4 Cover Cooling Fan Filter Inspect and clean Vacuum cleaner 6months 15 Minutes
Setting the replacement period for parts
The part inspection and replacement interval shall be set up based on the specified operation environment.
If the conditions for operation are poor, the part inspection and replacement interval may be reduced.
In the above table, C/S means our designated C/S company or our overseas local agents.
Consumables should be purchased for a fee, regardless of the warranty period.
Monthly Inspections (1/2)
Chapter 2
Inspection Items for Maintenance
Multi-Functional Placer
SM482PLUS Maintenance Handbook
2-6
Monthly Inspections (1/2)
Inspection Items for Maintenance