SM482PLUS_Maintenance(Eng_Ver2.7).pdf - 第68页
Mon thly Inspe ction Chap ter 5 Multi -Func tional Placer SM482PLUS Maintenance Handbo ok 5-1 5 Cleaning and apply grease, lubricating the conveyor LM guide, Lead screw It is possible to prevent deformation of the corres…

Monthly Inspection
Chapter 5
Multi-Functional Placer
SM482PLUS Maintenance Handbook
5-14
Checking and apply grease the X Axis, Y Axis Flat Cable
Monthly Inspection
Apply grease only to the surface in contact with the multi-tube, not
the entire surface of the guide mat.
(12 multi-tube width: 48 mm, 8 multi-tube width: 32 mm)
Step 6.
Apply grease to the Y Axis Flat Cable in the same way.
Step 7.
Release the emergency stop as described in “Releasing
‘Emergency Stop’ mode” on page 1-6 and perform the
operation again.

Monthly Inspection
Chapter 5
Multi-Functional Placer
SM482PLUS Maintenance Handbook
5-15
Cleaning and apply grease, lubricating the conveyor LM guide, Lead screw
It is possible to prevent deformation of the corresponding section by friction or an
error due to increased temperature.
Tool for Maintenance
Utra-fine fiber cloth, Flat Brush, Lubricator: KH-20, GREASE: GADUS S2 V220-2
Measures
Step 1.
Move the X Frame to rear by referring to “Backward
movement of the X-frame” on page 1-4.
Step 2.
Press the 'STOP' and 'RESET' buttons in order after
pressing the 'EMG' button on the OP panel to stop
operation.
For more details, refer to “How to perform emergency stop” on page
1-2.
Step 3.
Adjust the conveyor width
1
2
3
①Select the <PCB Edit> Menu
②Select the <Borad> Submenu
③Enter 200 (maximum size in the Y direction) in the <7. Board Size> group and
click the <Conv.Width> Button
Cleaning and apply grease, lubricating the conveyor
LM guide, Lead screw
(Time required: 30min /
No. M-10)

Monthly Inspection
Chapter 5
Multi-Functional Placer
SM482PLUS Maintenance Handbook
5-16
Cleaning and apply grease, lubricating the conveyor LM guide, Lead screw
Monthly Inspection
Step 4.
Remove dust and foreign material from the Work Station
and Exit Station, as well as the Lead Screw and LM Guide
Rail of the Entry Station using an ultra-fine cloth.
P C B O U T
P C B I N
Step 5.
Apply grease to the Lead Screw using a flat brush.
(GREASE: GADUS S2 V220-2)
P C B O U T
P C B I N