SM482PLUS_Maintenance(Eng_Ver2.7).pdf - 第31页
Chap ter 2 Inspe ction It ems fo r Main t e nanc e Multi -Func tional Placer SM482PLUS Maintenance Handbo ok 2- 6 Monthly Inspections (1/2) Inspection It ems for Maint enanc e

Chapter 2
Inspection Items for Maintenance
Multi-Functional Placer
SM482PLUS Maintenance Handbook
2-5
Monthly Inspections (1/2)
Check-up List
Maintenance
Cycle
Reference
Time
required
Period No Inspection Item Measures Tools
Monthly
M-1 Head Spindle Clean
Cleaning liquid, Air gun, Ultra
fine fiber cloth
30 Minutes
M-2 Conveyor Sensor / Fiducial Mark Inspect and clean
Cleaning liquid, Cotton Swab,
Ultra fine fiber cloth
10 Minutes
M-3 Cover Cooling Fan Inspect and clean
Crosshead screwdriver,
Vacuum cleaner
10 Minutes
M-4 Cover Cooling Fan Filter Inspect and clean Vacuum cleaner 6months 15 Minutes
Setting the replacement period for parts
ㆍ The part inspection and replacement interval shall be set up based on the specified operation environment.
ㆍ If the conditions for operation are poor, the part inspection and replacement interval may be reduced.
ㆍ In the above table, C/S means our designated C/S company or our overseas local agents.
ㆍ Consumables should be purchased for a fee, regardless of the warranty period.
Monthly Inspections (1/2)

Chapter 2
Inspection Items for Maintenance
Multi-Functional Placer
SM482PLUS Maintenance Handbook
2-6
Monthly Inspections (1/2)
Inspection Items for Maintenance

Chapter 2
Inspection Items for Maintenance
Multi-Functional Placer
SM482PLUS Maintenance Handbook
2-7
Monthly Inspections (2/2)
Check-up List
Maintenance Cycle Grease Spec.
Time
required
Period No Inspection Item Measures Tools
Monthly
M-5
Head Ball Spline, LM
Guide, Mirror CAM
Clean and apply grease
Ultra-fine fiber cloth, Flat
Brush, Syringe
Apply grease period: 3 months
Ball Spline : AFF-70
LM Guide Rail, Mirror CAM
: GADUS S2 V220-2
30 Minutes
M-6
X Frame LM Guide,
Ball Screw
Clean and Lubrication
Utra-fine fiber cloth,
Lubricator
Lubrication period: 4 months AFE-CA 60 Minutes
M-7 Y Frame LM Guide Clean and Lubrication
Utra-fine fiber cloth,
Lubricator
Lubrication period: 2 months AFE-CA 60 Minutes
M-8 Y Frame Ball Screw Clean and Lubrication
Utra-fine fiber cloth,
Lubricator
Lubrication period: 2 months AFE-CA 20 Minutes
M-9
X Axis, Y Axis Flat
Cable
Inspect and apply grease Utra-fine fiber cloth Apply grease period: 3 months KS-63W 20 Minutes
M-10
Conveyor LM Guide,
Lead Screw
Cleaning, apply grease,
Lubrication
Utra-fine fiber cloth, Flat
Brush, Lubricator
Apply grease period: 2 months GADUS S2 V220-2 30 Minutes
M-11 Cover Cleaning
Utra-fine fiber cloth,
Ethyl alcohol, Heavy Duty
Staticide #2005, #2001
Inspection period: 1 months 15 Minutes
Setting the replacement period for parts
ㆍ The part inspection and replacement interval shall be set up based on the specified operation environment.
ㆍ If the conditions for operation are poor, the part inspection and replacement interval may be reduced.
ㆍ In the above table, C/S means our designated C/S company or our overseas local agents.
ㆍ Consumables should be purchased for a fee, regardless of the warranty period.
Monthly Inspections (2/2)