Specification SIPLACE X-Series规格说明书2.pdf - 第49页

49 Technical Data SMEMA Interface Connector Assignment Signal interface (14-p ole connecting socket, interf ace standard 1.2) Upstream station X1 Downstream station X2 Pin 1 NOT READY + Pin 1 NOT READY + Pin 2 NOT READY …

100%1 / 80
48
SIPLACE Services
Training Courses for the SIPLACE X-Series
Capability Transfer
Under the heading of Capa-
bility Transfer we offer solu-
tions that will enable your
team to carry out tasks such
as verifying placement accu-
racy or the serviceability of
SIPLACE feeder modules to
SIPLACE standards. Not
only will we provide you with
all the tools or testing sys-
tems you will need for the
desired period, but we will
also train and coach your
team, even on site on your
premises. We will certify your
team and provide certificates
stating that its work conforms
to the SIPLACE standards.
We provide the Capability
Transfer solutions in the form
of standard packages. You
decide when you want the
solution and how often.
SMT Academy
The SMT Academy provides
training courses to give your
team the necessary technical
skills - from basic SIPLACE
operator training through to
advanced courses for your
experts. We can run courses
on your site or in one of our
SIPLACE Training Centers
around the world. In addition
to our range of standardized
courses, we can also tailor
training programs to your
specific needs. Before we do
that, we recommend that we
first carry out a knowledge
gap analysis as this will
enable us to identify very
easily where you have a
need to refresh technical
knowledge and skills.
SIPLACE training units are
always modular. This means
that you can register for a
standard course, but we can
also put together individual
topics to create a special
course specifically for your
production situation.
We can also provide upgrade
training that covers just the
differences between the
machines that you already
have in use and the newly-
installed machine platform.
If necessary we can also
modify the content of
courses to cover your spe-
cific requirements.
All of our courses take
account of the roles and
responsibilities of the partici-
pants, and can be run either
at a SIPLACE Training Cen-
ter or at your own production
facility.
The courses are also offered
in a wide range of languages.
Please ask for further details.
Options, Tools and Spares
Under Options, Tools and
Spares we offer machine
accessories and options
(some of which are listed in
this document), a range of
tools that you can use to
check or adjust your equip-
ment and original SIPLACE
spare parts to ensure top
quality repairs.
49
Technical Data
SMEMA Interface
Connector Assignment
Signal interface (14-pole connecting socket, interface standard 1.2)
Upstream station X1 Downstream station X2
Pin 1 NOT READY + Pin 1 NOT READY +
Pin 2 NOT READY – Pin 2 NOT READY –
Pin 3 BOARD AVAILABLE + Pin 3 BOARD AVAILABLE +
Pin 4 BOARD AVAILABLE – Pin 4 BOARD AVAILABLE –
Pin 5 Not used Pin 5 Not used
Pin 6 Not used Pin 6 Not used
Pin 7 Not used Pin 7 Not used
Pin 8 Reserved Pin 8 Reserved
Pin 9 Reserved Pin 9 Reserved
Pin 10 Reserved Pin 10 Reserved
Pin 11 Reserved Pin 11 Reserved
Pin 12 Reserved Pin 12 Reserved
Pin 13 Reserved Pin 13 Reserved
Pin 14 Reserved Pin 14 Reserved
50
Technical Data
SMEMA Interface
Signal Sequence
1. After switching on the station
Transport direction
Belt n Belt n+1
PCB sensor PCB sensor
Station n transports PCB
to the transfer position
Belt n running Belt n+1 stopped
BOARD AVAILABLE
Permission
Station n+1
is not ready
1
0
2. The PCB transfer has started
Transport direction
Belt n Belt n+1
PCB sensor
Station n transfers
PCB to Station n+1
Belt n running Belt n+1 running
Station n+1 expects
PCB from station n
3. PCB is transferred
Transport direction
Belt n Belt n+1
PCB sensor PCB sensor
Station n has
just transferred the PCB
Belt n stopped Belt n+1 running
Station n+1 expects PCB
from station n, but PCB
has not yet arrived.
PCB sensor
4. PCB transfer is complete
Transport direction
Belt n Belt n+1
PCB sensor PCB sensor
Station n
Belt n stopped Belt n+1 running
Station n+1
PCB arrived
Request
NOT READY
BOARD AVAILABLE
Permission
1
1
Request
NOT READY
BOARD AVAILABLE
Permission
0
1
Request
NOT READY
BOARD AVAILABLE
Permission
0
0
Request
NOT READY
To start a new PCB transfer, both signals must be “0” for at least 50 ms.