SOM-1613-002.pdf - 第3页
Before Use • Identifying Alert Icons : This symbol mark represents danger or prompts warning. : This symbol mark represents prohibited operations. : This symbol mark represents forced operations or instructions. 2. Expla…

Before Use
We are grateful to you for purchasing these special specified
products.
Please keep in mind the following items before use.
1. Please read this instruction manual carefully for correct use of
these special specified products.
The following warning signs are classified into three categories
according to the degree of danger.
Please fully understand the meaning of each sign for safety
precautions.
This manual is made of recycled paper.
0312-002 1 Tg0780-PM-SO
SOM-1613-002
INSTRUCTION MANUAL
(Rear Left Reference)
C-S070-39
TCM-X100 TCM-X110
SPECIAL SPECIFICATIONS
P.C.B. Locate Lever Automatic Adjustment Function
This indicates an imminently hazardous situation
which, if not avoided, will result in death or seri-
ous injury.
DANGER
This indicates a potentially hazardous situation
which, if not avoided, could result in death or seri-
ous injury.
WARNING
This indicates a potentially hazardous situation
which, if not avoided, may result in injury or physi-
cal damage.
CAUTION

Before Use
• Identifying Alert Icons
: This symbol mark represents danger or prompts
warning.
: This symbol mark represents prohibited operations.
: This symbol mark represents forced operations or
instructions.
2. Explained in this manual are only the items different from
those in the instruction manual of the main machine.
Use the instruction manual of the main machine together with
this manual.
3. The contents of this manual are subject to change without
prior notice.
Please contact our marketing department or sales agency for
the detailed information on these special specifications.
0209-001 2 Tg0780-PM-SO

Contents
Page
Before Use ................................................................................................... 1
Contents ....................................................................................................... 3
1. Scope ..................................................................................................... 4
2. Specifications ......................................................................................... 4
3. Precautionary Measures for Setup Operation ....................................... 4
4. Items to be Checked before Setup Operation ....................................... 5
5. Setup Operation ..................................................................................... 7
5.1 Setting of Setup Parameters ............................................................ 7
5.2 Overall Setup Operation after Selection of
the [Product Change] Tab .......................................................... 8
5.3 Overall Automatic Setup Function Interlocked with
Program Change ........................................................................ 11
6. Zeroing Operation ................................................................................. 12
7. "Origin/Signal Info." Tab ......................................................................... 14
8. Maintenance ........................................................................................... 15
8.1 Maintenance Spots ............................................................................ 15
8.2 Inspection ........................................................................................... 15
8.3 Lubrication.......................................................................................... 15
9. Device Offset ......................................................................................... 16
10. Material ................................................................................................ 17
10.1 Parts Location .................................................................................. 17
Layout of Main Machine Section 1 for TCM-X100 ........................... 17
Layout of Main Machine Section 1 for TCM-X110 ........................... 18
10.2 Layout of Sensors and Loads .......................................................... 19
X/Y Table Section ............................................................................ 19
10.3 Electrical Circuit Diagrams............................................................... 20
Integrated Block Connection Diagrams ........................................... 20
PPC-Axis Motor Circuit Diagrams.................................................... 21
10.4 Cord Connection Diagrams ............................................................. 22
X/Y Table Section ............................................................................ 22
C-S070-39 Connection Diagrams .................................................... 23
0312-002 3
Tg0780-PM-SO