ASM-X-Spec-SX12V2-EN-DMS.pdf - 第9页

9 SIPLACE SX1/SX2 Capacity-on-Demand SIPLACE Capacity-On-Demand business models Based on its SX platfor m, the SIPLACE team have devel- oped two new business mod- els to help custom ers master growing requirements and re…

100%1 / 80
8
SIPLACE SX1/SX2
Capacity-on-Demand
Capacity-on-Demand:
convincing solutions for
all situations
Modern electronic production
knows only one constant fac-
tor: change. The SIPLACE
SX allows you to adapt your
production environment to
different business require-
ments and to continue oper-
ating with high efficiency
despite changing produc-
tions scenarios. Start small
and enjoy quick and easy
growth whenever needed.
Look beyond the limits of
conventional, fixed line and
production concepts. Com-
pare with the SIPLACE SX -
and discover radical new
answers and scalable solu-
tions.
Free transfer of placement
capacity between the lines
Full order books often lead to
bottlenecks on the produc-
tion line and it becomes
impossible to honor cus-
tomer deadlines. In the past,
manufacturers were forced
to rely on other lines or addi-
tional suppliers, at increased
cost and time.
The SIPLACE SX solution:
Take SX changeover gan-
tries from lines with lower uti-
lization or borrow gantries
from SIPLACE. This trans-
fers targeted placement
capacity to lines experienc-
ing bottlenecks. The result:
Boost your line's capacity
within only a few minutes,
with no time-consuming con-
version or costly investment,
and meet all customer dead-
lines with no stress.
Scaling SMT lines syn-
chronous to ramp-up
A new product is introduced -
great potential but high risk.
A catch-22 situation: If your
SMT line is given insufficient
capacity, you may be faced
with bottlenecks, leading to
time-consuming and costly
production conversions
. On the other hand, if you
are too optimistic, you will be
piling up excess capacity and
high fixed costs.
The SIPLACE SX solution:
Scale your line synchro-
nously to the actual require-
ment. The SX changeover
gantries give your lines
reserve capacity which you
can call on without risk, when
your specific requirement
increases.
Borrow capacity for no-
risk and easy coverage of
peak requirements
Your production struggles
with seasonal or economy-
related order peaks. In the
past, you could choose
between outsourcing, a prob-
lematic solution for tempo-
rary peaks due to the costly
transfer of processes and
know-how, or an in-house
capacity increase, which
involves fixed costs and cap-
ital commitments that could
easily become a burden dur-
ing "quieter" periods.
The SIPLACE SX solution:
Use SX changeover gantries
to borrow the additional
placement capacity needed
on demand. This gives you a
flexible reserve for peak
times, helps minimize costs
and avoid excess capacity.
Targeted location quantity
and flexibility increases
You need greater feeder
capacity for new products.
The alternatives to date:
more conversions and down-
time or investment in a new
placement machine.
Although this new equipment
gives you the required num-
ber of additional locations,
you are also paying for any
excess capacity which is not
utilized.
The SIPLACE SX solution:
Invest for your specific needs
with a SX+ basic module with
locations. You save the costs
of heads and gantries. Just
move the existing SX
changeover gantries to the
new basic module.
Transfer gantries
between SMT lines
Scale gantries at
ramp-up
Borrow gantries for
placement capacity
Increase locations on
demand
Fully flexible production
9
SIPLACE SX1/SX2
Capacity-on-Demand
SIPLACE
Capacity-On-Demand
business models
Based on its SX platform, the
SIPLACE team have devel-
oped two new business mod-
els to help customers master
growing requirements and
remain competitive in the
electronics production arena.
These models offers two dif-
ferent options for use of the
"rent capacity on demand"
concept in conjunction with
SIPLACE SX machines.
The Peak-Demand models
addresses the need to cover
short-term fluctuations with
existing SIPLACE SX lines.
The other model, Floating-
Demand, provides custom-
ers with an alternative to the
standard package, thereby
improving their financial flex-
ibility, increasing asset pro-
ductivity and allowing full
exploitation of the benefits
offered with a SIPLACE SX
solution. For more informa-
tion about the business mod-
els, benefits and efficiency
calculations, refer to the bro-
chure available for order or
download at
www.siplace.com or contact
your local sales partner.
Make the most of unexpected peaks.
“"Boost profits during a boom"
"Step out with confidence for those long-term
business deals"
Cover seasonal peaks at minimum cost.
"Expand the capacity of your existing equipment
at low cost"
Optimize your assets long-term - and keep
cash in hand
"Get top asset productivity from your line what-
ever the economic climate"
"Keep your costs down when business is slow"
"Enjoy a flexible budget"
Buy capacity
(buy a gantry)
Rent capacity
(rent a gantry)
Transfer capacity
(move a gantry)
Buy locations for feed-
er modules
(buy SIPLACE SX+)
SIPLACE SX series: Platform for “SIPLACE Capacity-on-Demand”
Business model
“Peak-Demand”
Business model
“Floating-Demand”
10
Modular Machine Concept SIPLACE SX1/SX2
Step 1: Machine without gantry SIPLACE SX+
Step 2: Selection of gantries
SIPLACE SX1 with one gantry
SIPLACE SX2 with two gantries
Step 3: Selection of placement heads
SpeedStar (C&P20)
MultiStar (CPP)
TwinStar (TH)
Step 4: Selection of conveyor
Single conveyor
Flexible dual conveyor
Step 5: Selection of component trolley, WPC
Component trolley SIPLACE SX
WPC5 or WPC6
Step 6: Selection of feeder modules
X tape feeder modules
linear dipping unit X
Label presenter
Reject conveyor