4X4CEIM.pdf - 第33页
Page 1-9 INST ALLA TION 1 Preparations for Installation 4X4C-E-IMA01-A01-01 4X4C-001E TB 200V 230V 200V POUT PIN LD12F RV10C SP28P TB 100V 400V 400V 200V 200V Atomosphere temperature control unit POUT CN01 CN00 CN01 M.T …

Page 1-8
Preparations for Installation
1-1-7 Length of Cables
It is unnecessary to connect with other products except followings:
Ready and Stop line signals
Ethernet signals
AC power
The line signals are actually not connected with the machine system.
This means that this machine system is totally separated from the system of the surrounding
devices.
Attached communication specifications
The length of the line signal cable used for the machine (series) is less than 3 m, so no further
testing of these cables is required.
The length of Ethernet signal cable used for the machine (series) is less than 10 m.
The length of AC power cable used for the machine is less than 7 m.
(Use the shielding wire for AC power cable.)
4X4C-E-IMA01-A01-00

Page 1-9
INSTALLATION
1
Preparations for Installation
4X4C-E-IMA01-A01-01
4X4C-001E
TB
200V
230V
200V
POUT
PIN
LD12F RV10C
SP28P
TB
100V
400V
400V
200V
200V
Atomosphere
temperature
control unit
POUT
CN01CN00
CN01
M.T
200V
CN00
M.T
CN01 CN00 CN01
M.T
BD20S CM201/202
CN00 CN01
TB
100V
400V
400V
200V
100V
MC12C
CN00 CN01
PIN
200V
POUT
200V
CM301
CN00 CN01
400V
400V
LD12B
200V
PIN
CN00
3 400V
Atomosphere
temperature
control unit
φ
3 400V
φ
3 400V
φ
3 400V
φ
1 230V
φ
: Air
: Main terminal
: Transmission box
: Power
: Line signal
: Ethernet
: Signal
M.T
TB
PT
1 230V
φ
200/100V
TRY.P
TRY.S
DT40T
-40U

Page 1-10
1-2 Installation Procedure
NOTICE
Machine installation is conducted by experts.
Here, the outline of the procedure is described.
For rearranging the machine, make contact with the service department.
1-2-1 CM301-DU Installation Procedure
1) Machine transport state
During the machine transport, X-axis and Y-axis and are fixed with the fixing brackets (red) to
prevent removing.
4X4C-E-IMA01-A01-00
4X4C-012E
4H4C-AK00
X-axis fixing brackets (2 points)
Y-axis fixing brackets (4 points)