Chapter 1
This chapter describes the name of each part, teaching box and the
configuration of MMI(Man-Machine Interface).
Machine Overview
Advanced Chip Shooter
DECAN S2 Operation Handbook
1-5
Configuration of MMI > The configuration of 'production' screen
Configuration of MMI
'Option Setting' dialog box 'Tape Feeder Monitor' dialog box 'My PCB' dialog box
MEMO
Advanced Chip Shooter
Machine Overview
DECAN S2 Operation Handbook
1-6
Chapter 2
This chapter describes how to supply the power and the items to be
checked before starting production.
Supplying Power and Warming up
Advanced Chip Shooter
DECAN S2 Operation Handbook
2-1
Procedure Preparing for Production > Check the power and air pressure
Procedure Preparing for Production
1. Check the power and air pressure
Step 1.
Check the power connection
Caution
Be sure to check around and inside the machine before turning
on the main switch.
Check if there is any foreign matter such as a chip on the feeder
base, and whether the feeder is correctly installed.
Check if the nozzle is blocked with any foreign matter such as
solder and the operation of the nozzle spring is smooth.
Check whether the safety doors at the front and rear are open. If
opened, close them.
Chapter 2
Supplying Power and Warming up
This chapter describes how to supply the power and the items to be checked before starting production.
Step 2.
Check the air pressure (Within the range of 0.45~0.55 Mpa)
* Regulator pressure control
Pressure increase (Clockwise)
Pressure reduction (Counterclockwise)
Step 3.
Check the main switch is on
Caution
Check the room temperature before turning on the first machine
(Recommended temperature: above 20℃)
If the temperature is below 20℃, ensure that the room
temperature is 20℃. And then wait for 30 minutes before turning
on the machine torevent the condensation of air.
Procedure Preparing for Production