DECAN_S2_Operation(ENG_Ver4.1).pdf - 第42页

DE CAN S2 O pe rat ion H an db ook 3 -23 Chap ter 3 This chapter describes the production procedure. Pr oduction Advanced Chip Shooter Production > Starting production (Autom atic p roduction ) Production 2. St ar tin…

100%1 / 92
DECAN S2 Operation Handbook
3-22
Chapter 3
This chapter describes the production procedure.
Production
Advanced Chip Shooter
Production > Loading the PCB file
Production
Production
1. Loading the PCB file
Step 1.
Select the 'Product' menu
Displays the 'Product Monitor' screen.
Step 2.
Select the 'Start' submenu (F2)
If the 'Start' submenu is selected, the PCB program is downloaded automatically.
Production
DECAN S2 Operation Handbook
3-23
Chapter 3
This chapter describes the production procedure.
Production
Advanced Chip Shooter
Production > Starting production (Automatic production)
Production
2. Starting production (Automatic production)
Step 1.
Press 'START' button in the operation pannel
Starts production.
Warning
Check if there is a worker around the machine before starting
production.
DECAN S2 Operation Handbook
3-24
Chapter 3
This chapter describes the production procedure.
Production
Advanced Chip Shooter
Production > Starting production (Quantity designated production)
Production
Production
3. Starting production (Quantity designated
production)
Step 1.
Set the production quantity
Select the 'Start' submenu after setting the total number of PCBs to be worked in
the <Production plan> edit box
Set the total number of PCBs to be worked in the <Production plan>
edit box. If the value becomes 0, the production is stopped.
Step 2.
Press 'START' button in the operation pannel
Starts production.
Warning
Check if there is a worker around the machine before starting
production.