00198761-01_SM_Head_Care_Station_II_EN.pdf - 第39页
4 Service work – HCSII Head Unit 4.12 Replacing the Head Care Interface Service Manual SIPLACE Head Care Station II 11/2019 39 Fig.50: Removal 2 ► Open any cable ties where necessary. You may want to mark the positions…

4 Service work – HCSII Head Unit
4.12 Replacing the Head Care Interface
38 Service Manual SIPLACE Head Care Station II 11/2019
4.12 Replacing the Head Care Interface
Parts
Fig.48: Head Care Interface HCSII V2.3
●
Head Care Interface HCSII V2.3
[03149124‑xx]
Preparatory work...
► Turn off and disconnect the HCS II. See 3.1 "Turn off and disconnect the HCS II" [}19].
► Perform the steps described in section 3.3 "Access to the spare parts of the HCS II Head
Unit" [}20].
► Remove the contactors K3 and K4. See 3.5 "Remove the contactors K3 and K4" [}22].
Removal
Fig.49: Removal 1
► Remove the four screws(1) fastening
the fan(2).
► Remove the fan.

4 Service work – HCSII Head Unit
4.12 Replacing the Head Care Interface
Service Manual SIPLACE Head Care Station II 11/2019 39
Fig.50: Removal 2
► Open any cable ties where necessary.
You may want to mark the positions of
the relevant connections to make clear
assignment easier later on.
► Unplug the cables.
► Remove the nine screws(3) fastening
the Head Care Interface(1) on the
frame. Make sure that the screws are
not lost.
► Disconnect the grounding connec-
tion(2).
► Remove the four distance nuts(4)
fastening the front connections.
Fig.51: Removal 3
► Carefully remove the Head Care Inter-
face.

4 Service work – HCSII Head Unit
4.12 Replacing the Head Care Interface
40 Service Manual SIPLACE Head Care Station II 11/2019
Fig.52: Head Care Interface with LabJack
1. Head Care Interface HCSII V2.3
[03149124‑xx]
2. LabJack UE9 [03085251‑xx]
► Remove the LabJack(2) from the Head
Care Interface(1). See 4.13 "Replacing
the LabJack" [}41].
Installation
Observe the sequence of the installation:
► Install the LabJack on the Head Care Interface. See 4.13 "Replacing the LabJack" [}41].
► Insert the Head Care Interface into the frame and connect the cables (X31, X19, X20, X19,
X6, grounding connection).
► Put the Head Care Interface in position and thighten the screws.
► Install the LabJack USB connection.
► Connect the cables X90, X102, X1, J1, J2, X15 to X18 (coded), X2, X107 (not used).
► Tighten the four distance nuts fastening the front connections on the outside of the casing.
► Install the fan (X26).
► Install the contactors K3 and K4. See 3.5 "Remove the contactors K3 and K4" [}22].
► Replace any cable ties which you have removed.