Operating Manual.pdf - 第60页
4022 591 960 62 Operating Manual 02.0 2 FCM Mu ltif lex 58 New Progr am Selection 10.Rep eat a ction “ re move no z z le ” untill “ pla ce n ew n ozzl e ” fo r a ll C om pac t Laser Modules where calibration nozzles have…

4022 591 96062 Operating Manual
02.02 FCM Multiflex 57
New Program Selection
7. Select “Lower MUP” “F5” or press “F5” (MUP will be sent down).
SCREEN 38
8. For the first Compact Laser Module where a nozzle has to be exchanged:
Remove nozzle and brush
FIGURE 99
9. Place the calibration nozzle, take care for O-ring and spring be sure the
flange is against the MUP. If not, turn and push.
FIGURE 100

4022 591 96062 Operating Manual
02.02 FCM Multiflex 58
New Program Selection
10.Repeat action “remove nozzle” untill “place new nozzle” for all Compact
Laser Modules where calibration nozzles have to be exchanged
11.Select “Done” (MUP will move up)
SCREEN 39
12.Close the Run-in and Run-out cover.
FIGURE 101

4022 591 96062 Operating Manual
02.02 FCM Multiflex 59
8.6 On Line Calibration
FIGURE 102
Start Production
Start Production
F5
F5
o
p
e
n
b
o
a
rd
p
o
s
itio
n
1
X
N
o
b
o
a
rd
o
p
e
n
b
o
a
rd
p
o
s
itio
n
1
X
N
o
b
o
a
rd
o
p
e
n
b
o
a
rd
p
o
s
itio
n
1
X
N
o
b
o
a
rd
Feed FCM Multiflex transport with calibtration Boards as shown
Press “F3” when Boards in Run-out gives the failure message:
"Suspected Board in Run-out section"
after removing last Calibration Board
Stop Production
Stop Production
F6
F6