YC8_Mainte_E.pdf - 第31页
i Introduction 1. About this manual Descriptions in this manual stress important maintenance items that are essential for maintaining equipment perfor mance. Information given here mainly describes making inspections, cl…

The instruction manual of this machine is written for those who operate
this machine.
Please read this manual carefully for correct operations and pay
special attention to safety precautions.
After reading through this manual, please use this manual as an
occasional reference and keep it within reach.
Introduction
Contents
1. About this manual i
2. Maintenance list ii

i
Introduction
1. About this manual
Descriptions in this manual stress important maintenance items that are essential for maintaining equipment
performance. Information given here mainly describes making inspections, cleaning and greasing as well as
procedures for replacing consumable parts in each location given in a step-by-step format. This manual is
comprised of the following chapters.
Chapter 1 Maintenance
Describes conditions and environments to use for maintaining equipment performance. The importance of making daily
checks and performing cleaning tasks is explained. Setups to make before starting maintenance work, consumable parts
and maintenance tools as well as the necessary tools are also described.
Chapter 2 Daily maintenance items
Making checks and cleaning the machine are essential daily maintenance tasks for maintaining equipment performance.
Performing these tasks prevents unforeseen trouble and allows using the machine in an optimum state.
Chapter 3 Periodic maintenance items
Describes maintenance tasks that should be performed periodically to maintain equipment performance. Includes
periodic maintenance intervals such as for "weekly", "monthly or bimonthly", "3-month", "6-month" and "1-year"
maintenance tasks.
Chapter 4 Lubrication points
Indicates lubrication points and describes methods for lubricating the ball screws and guides of each axis.
Chapter 5 How to replace consumable parts
Describes methods for replacing parts subject to constant wear such as nozzle leaf springs and ejector valves.
w
WARNING

ii
Introduction
2. Maintenance list
n
Maintenance list
:
Perform maintenance. : Replace or adjust if necessary after inspection M : Month H : Hour
: Check or adjust after replacement : Contact us. - : Not required.
Inspection
Cleaning/
Lubrication
Replacement
Section Check item
Weekly
Monthly
3 Mon.
6 Mon..
Others
Clean-
ing
Lubri-
cation
Frequency Action
Head
Nozzle
Air path
-
Spring action
pick-up surface
condition
-
Leaf spring Holding condition - -
Spline shaft Air path - -
Ejector unit
Filter
-
Vacuum pressure - -
Blow valve - -
Z-axis Holding condition - -
R-axis timing belt Holding condition 1Y - -
X and Y axes
X-axis
Ball screw
Guide
Y-axis
Ball screw
Guide
Conveyor
Board sensor
Condition and
operation
-
Board clamp
Condition and
operation
-
Board transport
unit
Conveyor belt -
Push-up Ball screw
Bimonthly
W-axis conveyor
Ball screw
6M
Guide 6M
Hexagon spline 6M
Vision
system
Camera lighting
unit
Fiducial camera
-
Multi-vision camera
1Y -
Others
Controller Filter 1Y -
Air/mist filter Filter
-