00192975-01.pdf - 第73页

S-20/S-23HM/F4/F5/F 5HM/S-25HM/HS- 50 Conversion Instructions Power supply 03/2001 Edition 2 Sa fety che ck t o DI N E N 6 0 204 73 testing de vice in the distr ibutor bo x. The ends of the ca bles m ay be plu gs or sock…

100%1 / 134
Power supply S-20/S-23HM/F4/F5/F5HM/S-25HM/HS-50 Conversion Instructions
2.1 Safety instructions 03/2001 Edition
72
2 Safety check to DIN EN 60 204
The safety check comprises: 2
insulation test
high-voltage test and
PE conductor test on the machines and components.
2
To protect the test set-up, you will need 2
a barrier chain
a red flashing light to signal the high-voltage tests
country-specific warning and identification signs to draw attention to the fact that work and
high-voltage tests are being carried out on the electrical system.
2.1 Safety instructions
RISK OF DEATH 2
Å Make sure that no unauthorized persons can come into contact with any parts of the machine.
Å Secure the testing area with a barrier chain and warning signs.
Å Also switch on a red flashing light during the high-voltage test.
Å House the electrical points of contact between the test device and test piece in a distributor box
with protective hood.
Å Make sure that the protective hood remains closed during the test.
Å Monitor opening of the protective hood with a circuit-breaker.
The circuit-breaker must be incorporated into the safety circuit of the high-voltage testing
device so that the high voltage is switched off immediately if the protective hood is opened.
2.2 Testing equipment
2.2.1 Three-phase AC socket with connecting cable for the insulation and high-voltage
test
For the insulation and high-voltage tests, you will need a three-phase AC socket with connecting
cable as shown in the following drawing. This is used to electrically connect the test piece to the
S-20/S-23HM/F4/F5/F5HM/S-25HM/HS-50 Conversion Instructions Power supply
03/2001 Edition 2 Safety check to DIN EN 60 204
73
testing device in the distributor box. The ends of the cables may be plugs or sockets, depending
on the type of connection. 2
Fig. 2 - 1 Three-phase AC socket for the insulation and high-voltage test
2.2.2 Socket with earthing contact and connecting cable for the insulation and
high-voltage test
For the insulation and high-voltage tests, you will need a socket with earthing contact and a
connecting cable as shown in the following drawing. This is used to electrically connect the test
piece to the testing device in the distributor box. The ends of the cable may be
plugs or sockets, depending on the type of connection. 2
Fig. 2 - 2 Socket with earthing contact for the insulation and high-voltage test
2.2.3 Distribution box for the insulation and high-voltage test
A distributor box with protective hood is required for the electrical connection between the test
device and test piece. When the protective hood is closed, the circuit-breaker in the distributor box
closes the safety circuit of the testing device. If the protective hood is opened, the protective hood
switch interrupts the safety circuit, immediately disconnecting the high voltage used for the test. 2
Power supply S-20/S-23HM/F4/F5/F5HM/S-25HM/HS-50 Conversion Instructions
2.2 Testing equipment 03/2001 Edition
74
Two different versions of the distributor box may be used to connect the testing device: 2
a 'LVWULEXWRUER[IRUFRQQHFWLQJWKHSUREHVRIWKHWHVWLQJGHYLFH
Fig. 2 - 3 Distributor box for connecting the probes of a testing device
s 'LVWULEXWRUER[ZLWKIL[HGFRQQHFWLQJFDEOHVWRWKHWHVWLQJGHYLFH
Fig. 2 - 4 Distributor box for connecting fixed connecting cables to the testing device