00192975-01.pdf - 第77页
S-20/S-23HM/F4/F5/F 5HM/S-25HM/HS- 50 Conversion Instructions Power supply 03/2001 Edition 2 Sa fety che ck t o DI N E N 6 0 204 77 W ARNING 2 Parts of the system t hat ar e not rated for the tes t voltage mu st be d isc…

Power supply S-20/S-23HM/F4/F5/F5HM/S-25HM/HS-50 Conversion Instructions
2.4 High-voltage test 03/2001 Edition
76
Fig. 2 - 5 Insulation test set-up
2.4 High-voltage test
2.4.1 Minimum durations and voltages for the high-voltage test
The electrical system must withstand a test voltage applied between the conductors of all the
power circuits and the PE conductor system for at least 60 seconds. 2
The test voltage must 2
– be twice the rated voltage for the electrical system or 1000 V, whichever is the higher.
– have a frequency of 50/60 Hz and
– be powered by a transformer with a minimum rated output of 500 VA.
METRAWATT
tester
Probes
MOhm Ohm
0.5 - 10 0 - 0.5
12
11
RD28K safety tester
Line adapter
Alternative: METRAWATT device
Measurement line+
-
PE
N
L3
L2
L1
L1
L2
L3
N
PE
Main power
One-button
measurement bridge
Distributor box with
three-phase current plug or
grounding socket
Probe
Power supply
for placement
system,
CO table,
WPC
cable

S-20/S-23HM/F4/F5/F5HM/S-25HM/HS-50 Conversion Instructions Power supply
03/2001 Edition 2 Safety check to DIN EN 60 204
77
WARNING 2
Parts of the system that are not rated for the test voltage must be disconnected. This particularly
applies to the monitor. 2
2.4.2 High-voltage testers
2.4.3 Performing the high-voltage test
– Disconnect the monitor.
– In the distributor box, connect the three-phase AC socket or socket with earthing contact to the
power cable for the machine, feeder table or WPC. The test set-up is shown in figure 2 - 5
.
RISK OF DEATH 2
To protect the test set-up, you will need 2
Å a barrier chain
Å a red flashing light to signal the high-voltage tests and keep unauthorized personnel away from
the system.
Å Switch on the testing device and measure the equivalent leakage current with the following
settings:
- 1000 VAC
- Test duration - 60 seconds
Å Measure the equivalent leakage current (active or apparent current).
Available testers
•ELECTROTECHNICAL LABORATORY, KORNTAL RD28K safety tester
• GOSSEN-METRAWATT 204P
• METRAMACHINE 204 (compete system for tests to VDE0113) consisting
of Profikit 204, Profitest 204 HP, Signal 204, Leadex 204 and Caddy 204
Power output 500 VA
Test duration 60 seconds
Equivalent leakage
current
up to 100 mA
Tab. 2 - 2 High-voltage testers

Power supply S-20/S-23HM/F4/F5/F5HM/S-25HM/HS-50 Conversion Instructions
2.5 PE conductor test 03/2001 Edition
78
Å Enter the measured value into the test report.
If the measured value is < 100 mA, the machine has passed the high-voltage test and can be
released. If the measured value is greater, the error must be eliminated. and the test repeated.
2.5 PE conductor test
2.5.1 Permissible impedance values for the PE conductors
The PE test is used to test the continuity of the PE conductor system by means of a loop
impedance measurement to IEC 60364-6-61, 612.6.3. 2
PLEASE NOTE:
All the electrical connections must be fully installed on the machine, including those for the power
supply. 2
The impedances measured between the PE terminal and the test points must not exceed the
values shown in the following table. 2
2
2.5.2 PE conductor testers
Smallest effective PE conductor cross-section in
branch to be tested
[mm²]
Maximum permissible impedance
[Ohm]
1.0 0.33
1.5 0.26
2.5 0.19
4.0 0.14
> 6.0 0.1
Tab. 2 - 3 Permissible impedance values for different PE conductor cross-sections
Available testers
• ELECTROTECHNICAL LABORATORY, KORNTAL RD28K safety tester
• GOSSEN-METRAWATT 204P
• METRAMACHINE 204 (compete system for tests to VDE0113) consisting
of Profikit 204, Profitest 204 HP, Signal 204, Leadex 204, Caddy 204
Test duration 10 seconds
Tab. 2 - 4 PE conductor testers