User Manual SIPLACE Linear Dipping Unit 2 X.pdf - 第73页
4 Operation 4.12 Fitting User Manual SIPLACE Linear Dipping Unit 2 X 05/2020 73 Fitting the drip tray and the park plate Prerequisites: The park plate and the drip tray are not yet fitted. ► Click on the Fit drip tray an…

4 Operation
4.12 Fitting
72 User Manual SIPLACE Linear Dipping Unit 2 X 05/2020
4.12 Fitting
NOTICE
Target group: standard operator
The procedure described is a regular task that can be carried out by any trained operator.
Before filling in the flux, you have to fit all the parts of the LDU. You will be guided through this pro-
cess by the station software.
NOTICE
Observe the exact order
It is important to perform the steps for fitting the parts in the order described here.
► In the station software, select the Setup
view(1) and then the Locations area (2).
► Select the Table (3) on which the LDU is
set up.
► Select the icon of the LDU(1).
► Click on the Settings... button (2).
► Select the Cleaning tab.

4 Operation
4.12 Fitting
User Manual SIPLACE Linear Dipping Unit 2 X 05/2020 73
Fitting the drip tray and the park plate
Prerequisites: The park plate and the drip tray are not yet fitted.
► Click on the Fit drip tray and park plate
button.
(1) The LDU moves the squeegee axis to the
front over the lifting axis.
► (2) Fit the drip tray.
► Fit the park plate.

4 Operation
4.12 Fitting
74 User Manual SIPLACE Linear Dipping Unit 2 X 05/2020
Fitting the dipping plate
Prerequisites: The drip tray and the park plate are fitted. The dipping plate is not yet fitted.
► Click on the Fit dip plate button.
(1) The LDU moves the squeegee back over the
park plate and moves the lifting axis up.
► (2) Fit the dipping plate in the orientation
shown.
Fitting the flux tank
Prerequisites: The park plate and the dipping plate are fitted.
► Click on the Fit flux tank button.