YG200_YG200L_Mainte_E.pdf - 第84页

4-7 4 How to replace consumable parts 6 . H e a d u p / d o w n a i r v a l v e s I f a p a r t i c u l a r h e a d d o e s n o t m o v e s m o o t h l y o r d o e s n o t o p e r a t e a t a s l o w s p e e d e v e n a …

100%1 / 87
4-6
4
How to replace consumable parts
5. Conveyor belt
1
Press the emergency stop button.
e
The machine must be in emergency stop to
ensure safety during work.
2
Mark the original position of the
belt tension adjustment bolt.
Put a mark at the original position of the belt
tension adjustment bolt before removing the
bolt.
53411-F8-00
3
Slacken the conveyor belt.
Loosen the belt tension adjustment bolt with
the M4 hex wrench and slide the bolt to the
right end (to the outer side of the machine)
along the slot hole.
53412-F8-00
4
Detach the conveyor belt from the
conveyor.
Use the M3 hex wrench to loosen the bolt
securing the drive pulley and pull out the
shaft. Then detach the belt from the pulley
and take it out through the space between
the pulley and the shaft.
53413-F8-00
5
Clean the conveyor rail.
Use a brush or air blow gun (with weak air
blow) to clean the gap between the
conveyor rail and PCB guide.
6
Attach a new conveyor belt.
1. Temporarily fit a new belt onto the pulley.
2. Reconnect the shaft to the pulley and
tighten the bolt.
3. Move the belt tension adjustment bolt to
the original position where you put a
mark and then tighten the bolt securely.
7
Check the belt rotating condition.
1. Open the [Unit]-[Conveyor] tab screen,
and turn on the conveyor motor with the
conveyor drive button. Then check the
belt rotation.
2. If the rotation speed fluctuates or there is
slack in the belt, adjust the position of
the tension adjustment bolt and then
check the rotation again.
Loosening the belt tension adjustment bolt
Step 3
Marking
Loosen this bolt.
Removing the shaft
Step 4
Shaft
Drive pulley
Cleaning the conveyor rail
Step 5
Air blow gun
4-7
4
How to replace consumable parts
6. Head up/down air valves
If a particular head does not move smoothly or does not operate at a slow speed even after selecting the
slow speed, the head up/down air valve or the head speed switching valve may be defective. If a head up/
down air valve is found to be defective, replace it as explained below.
6.1 Replacing the head up/down air valve
1
Shut off the air supply and turn off
the machine.
Turn the air supply/shutoff switch to the right
to cut off the air supply, quit the software,
and turn off the machine power switch.
53414-F8-00
2
Unplug the connector.
Unplug the connector of the head up/down
air valve to be replaced.
3
Remove the head up/down air
valve.
Use the Phillips screwdriver to loosen the two
screws securing the head up/down air valve,
and remove the head up/down air valve.
53415-F8-00
c
CAUTION
Be careful not to lose the O-ring and packing placed
between the head up/down air valve and manifold.
4
Attach a new head up/down air
valve.
1. Fit the O-ring and packing into the
manifold.
2. Pass the two screws through the new air
valve and tighten them into the manifold
with the Phillips precision screwdriver.
53416-F8-00
5
Attach the connector.
Plug the connector of the new air valve into
the mating socket.
6
Check operation status.
Supply air to the machine and turn on the
power switch. Open the [Unit]-[Head] tab
screen, press the [Head] button several
times, and check that the head lowers and
rises smoothly.
Shutting off the air supply
Step 1
Air supply/shutoff switch
Removing the connector and valve
Step 2,3
Head up/down valve
Attaching a new head up/down valve
Step 4
Connector
4-8
4
How to replace consumable parts
6.2 Replacing the slow-speed valve
If a slow-speed valve (head up/down speed switching valve) is found to be defective, replace it as follows.
1
Shut off the air supply and turn off
the machine.
Turn the air supply/shutoff switch to the right
to cut off the air supply, quit the software,
and turn off the machine power switch.
2
Unplug the connectors.
Unplug all connectors to the vacuum ejector
air valves, head up/down air valves, vacuum
sensors and the ground wire.
3
Disconnect the air tubes.
1. Disconnect all air tubes from the air joints
connected to the vacuum ejector valves
and head up/down air valves.
2. Use the Phillips screwdriver to remove the
ground wire connected to the cover
frame.
53417-F8-00
4
Remove the head down sensor stay.
Use the M3 hex wrench to loosen the two
bolts securing the stay and remove it from
the head assembly.
5
Remove the bolts on the upper
frame of the head assembly.
1. Remove the bolts on the upper frame of
the head assembly.
2. Loosen the M3 bolt on the lower part of
the head assembly I/O cover.
3. Unplug the connectors of the harness
wires coming from the I/O board and pull
the upper frame towards you.
4. Disconnect the air hose for shaft blow.
(YG200L only)
5. Use the hex wrench to remove the
manifold for the shaft blow valve. (YG200L
only)
53400-F4-00
6
Remove the ejector valve unit.
Use the M3 hex wrench to loosen the four
bolts securing the ejector valve unit and
remove it from the head assembly.
53418-F8-00
c
CAUTION
Be careful not to lose the O-rings.
Removing the manifold and air hose
Step 5-4,5
Air hose for shaft blow Manifold
Removing the ejector unit
Step 6
Ejector unit
M2.5 hex wrench
Unplugging the connectors
Step 2