TM3355.CheckNozzleBuffingFunctionSpecifications.pdf - 第15页

Y AMAHA M otor Co. Ltd ., IM Company SMT Software Engineering Grou p MDOC-SOFT50 052 15 /27 5.2. Result of Che cking An execution result can be check ed after a nozzle buffing c heck by s chedu le spec ification as well …

100%1 / 27
YAMAHA Motor Co. Ltd.,
IM Company
SMT Software Engineering Group
MDOC-SOFT50052
14/27
Executive Condition Execute timing
None Not execute.
Power ON
Immediatelyafterthe first return-to-originafterthe
powerONofmachine.
Power OFF
Immediatelyafterclickingthe[PowerOFF]button.
Reset
Afterthecompletionofreset.
Start Run
Immediately after pushing the [START] button on the
operationpanel.
Lot Start + Auto Running
-Atthetimeofthefirstauto-runningstartafterthe
powerON.
-Whenaboardischanged.
-Whenaboardiscarriedoutpassingthetimeof[Cycle
Condition].
Only During Auto Running
Whenaboardiscarriedoutpassingthetimeof[Cycle
Condition].
For [Cycle Condition], select any of [Minute Unit], [Every Day], or [Every Week] .
When you select [Every Day] or [Every Week], you need to set a cycle time.
(4) Select a range of nozzle buffing check execute.
[Execute all]
This can be selected only for a machine with an effective nozzle station.
Executes a buffing check for nozzles with “AutoNzlChg” selected on [VmSpec] - [Machine
Data] - [Head] – [Head Offset] - [Head Type]
[Select nozzle]
This can be selected for a machine with/without an effective nozzle station.
When a nozzle station is not effective, select this item.
Executes a buffing check for all nozzles used for loaded board data.
Executionproprietyofexecutivecondition
Power ON Power OFF Reset Start Run
Lot Start +
Auto Running
Only Auto
Running
Executeall O O O O O O
Selectnozzle
X X X O(*) O O
(*) Executed only with board data loaded.
YAMAHA Motor Co. Ltd.,
IM Company
SMT Software Engineering Group
MDOC-SOFT50052
15/27
5.2. Result of Checking
An execution result can be checked after a nozzle buffing check by schedule specification as well
as after [Unit] - [Head] - [Buffing Check] executed.
Please refer to "4.2. Result of Checking" for details of the execution result of nozzle buffing
check.
When the nozzle buffing check by schedule specification doesn’t detect any abnormality, no
message is displayed.
With [Setting] - [Specification Information] - [Schedule Specification] - [Executive Condition] set to
“Lot Start + Auto Running” or “Only Auto Running”, when an abnormal nozzle buffing is detected
during auto-running, the machine stops and you can maintain the nozzle.
Auto-running is continued if any abnormality is not detected.
5.3. When an abnormal nozzle is detected
When an abnormal nozzle is detected by schedule specification nozzle buffing check, please
check the nozzle again with [Unit] - [Head] - [Buffing Check].
If there is actually no problem, you can start auto-running.
If there is a problem, maintain or exchange the nozzle.
YAMAHA Motor Co. Ltd.,
IM Company
SMT Software Engineering Group
MDOC-SOFT50052
16/27
5.4. Result of checking by Schedule Task Monitor
The execution result of nozzle buffing check can also be checked on the schedule task monitor
screen.
This section explains how to check the result.
(1) Machine setting
Confirm that “Nozzle Buffing Check” is selected on [Setting] - [Specification Information] -
[Schedule Specification], and the [Result display] check box is checked.
Fig. 5.4.1 The result display setup of nozzle buffing check.