Site Prep Checklist
Use this checklist to check off each task as you complete it.
Table 1-1 Site preparation checklist
Task Checklist
Planning [ ] Location chosen?
Specialists assigned?
Site Coordinator:
__________________________________________________________
System Administrator:
__________________________________________________________
Structural Specialist:
__________________________________________________________
EMC Specialist:
__________________________________________________________
Environmental Specialist:
__________________________________________________________
Electrical Specialist:
__________________________________________________________
Vacuum Specialist:
__________________________________________________________
Compressed Air Specialist:
__________________________________________________________
Communications Specialist:
__________________________________________________________
[ ] Schedule Created:
Structural Requirements [ ] Floor suitable?
[ ] Room to move the big box? If not, do you have a place to unpack it?
[ ] Storage sufficient?
RF Attenuation Requirements [ ] Required to meet EMC directives?
[ ] Additional attenuation sufficient?
Environmental Requirements [ ] Air quality suitable?
[ ] Ambient temperature suitable?
[ ] Cooling sufficient?
[] Humidity suitable?
[ ] Electromagnetic environment suitable?

Site Preparation Process 1
Site Preparation 1-7
Power Requirements System Power
What power option is your system? Opt. _______________
[ ] AC mains power verified?
[ ] Mains disconnect installed?
[ ] Do you need to install power conditioning equipment?
[ ] Do you need to install a new transformer?
[ ] What system drop wire size is required? Wire Size ____________
[ ] What system drop breaker size is required? Breaker Size ____________
[ ] Power cable installed for mains?
Connect Mains Power
[ ] Power installed to system?
Convenience Outlet Power
[ ] Testhead strip printer?
[] Testhead server?
Compressed Air and Vacuum
Requirements
[] Compressed air line installed?
[ ] Vacuum plan done?
[ ] How many solenoids needed? _____________
[ ] Vacuum equipment installed?
Networking [ ] LAN cabling installed?
The i3070 communicates with other systems via IEEE 802.3 Local Area Networking. All the necessary
software and licensing comes with the system, but the customer is responsible for installing the
external LAN cabling to the i3070.
The internal testhead LAN within each i3070 system — which includes the System Card and Module
Control Card in each module — is identical between systems. However, the hardware address for
each System Card and Module Control Card is unique. The hardware address is assigned at the
factory and is marked on each card.
The remaining items go beyond site preparation, but must be completed before installation
Receiving and Moving Instructions [ ] Insurance coverage arranged for arrival?
[ ] System inspected for physical damage?
[ ] Shipment inventoried?
[ ] Equipment moved to installation site?
[ ] Testhead unpacked (tri-wall box removed, but not removed from the pallet). The Keysight
representative will unpack the smaller boxes and move the system as part of installation.