9018-18076.pdf.pdf - 第5页
Keysight i3070 Series 5 In-Circuit Test System Site Preparation 1 Site Preparation Process The Importance of Site Pr eparation 1-2 Responsibilities 1-3 The Site Pr eparati on Pr ocess 1-5 Site Pr ep Checklist 1-6
iv
7 Compressed Air and Vacuum Requirements
Introduction 7-2
Compressed Air Requirements 7-3
Connecting Air to the Testhead 7-3
Compressed Air Specifications 7-4
Air Quality 7-4
Vacuum Requirements 7-5
Vacuum Recommendations and Guidelines 7-5
Connecting Vacuum to the Testhead 7-6
Compressed Air and Vacuum Primer 7-7
8 Receiving and Moving Instructions
Inventory the Shipment 8-2
Uncrating the System and Support Bay 8-3
Placing the System 8-4
Re-shipping a System 8-5
1-2 Site Preparation
1 Site Preparation Process
The Importance of Site Preparation
The Keysight i3070 family of in-circuit test (ICT) systems includes complex and sophisticated
automatic test equipment. To ensure that your site is properly equipped for your new system, and to
minimize the possibility of problems or delays in system installation, you must consider many things
during site preparation. Before calling your local Keysight representative to install your i3070 system,
read and follow the recommendations provided in this manual.
This manual contains the following chapters:
• Chapter 1, Site Preparation Process (this chapter) discusses your responsibilities, lists Keysight’s
responsibilities, and provides a checklist to use as you proceed.
• Chapter 2, Planning discusses choosing a site for your system, designing your site layout,
assigning people to do various preparation tasks, and scheduling your preparations.
• Chapter 3, Structural Requirements describes floor, access, and storage requirements.
• Chapter 4, RF Attenuation Requirements describes the additional RF attenuation required as part
of the installation to meet the installed radiated emission limits for some countries.
• Chapter 5, Environmental Requirements describes air quality, temperature, humidity, and
electromagnetic shielding requirements.
• Chapter 6, Power Requirements describes power requirements for the various parts of the system
and mains power connections.
• Chapter 7, Compressed Air and Vacuum Requirements describes the compressed air and vacuum
that the system requires.
• Chapter 8, Receiving and Moving Instructions describes the uncrating, handling, and re-shipping
process for the i3070.