9018-18076.pdf.pdf - 第68页

8-2 Site Preparation 8 Receiving and Moving Instructio ns Inventory the Shipment Use the packing list tha t came with your system to determine if the system was fully received. Carefully examine the boxes for shipping da…

100%1 / 71
Keysight i3070 Series 5
In-Circuit Test System
Site Preparation
8 Receiving and Moving Instructions
Inventory the Shipment 8-2
Uncrating the System and Support Bay 8-3
Placing the System 8-4
Re-shipping a System 8-5
8-2 Site Preparation
8 Receiving and Moving Instructions
Inventory the Shipment
Use the packing list that came with your system to determine if the system was fully received.
Carefully examine the boxes for shipping damage. If you suspect the system was damaged in
shipment, contact your Keysight representative.
Receiving and Moving Instructions 8
Site Preparation 8-3
Uncrating the System and Support Bay
The customer should remove the tri-wall box from the pallet. The Keysight representative will uncrate
the system pallets. Leave the smaller boxes intact for the Keysight representative to unpack when the
system is installed.
Follow the uncrating instructions in Uncrating the i3070.