Receiving an d Moving Instruct ions 8 Site Preparation 8-3 Uncrating the System and Support Bay The customer should remove the tri-wall box from the pallet. The Keysight representative will uncrate the system pallets. Le…

100%1 / 71
8-2 Site Preparation
8 Receiving and Moving Instructions
Inventory the Shipment
Use the packing list that came with your system to determine if the system was fully received.
Carefully examine the boxes for shipping damage. If you suspect the system was damaged in
shipment, contact your Keysight representative.
Receiving and Moving Instructions 8
Site Preparation 8-3
Uncrating the System and Support Bay
The customer should remove the tri-wall box from the pallet. The Keysight representative will uncrate
the system pallets. Leave the smaller boxes intact for the Keysight representative to unpack when the
system is installed.
Follow the uncrating instructions in Uncrating the i3070.
8-4 Site Preparation
8 Receiving and Moving Instructions
Placing the System
Moving the Testhead and Support Bay
Make sure all leveling feet are turned up as high as they go before rolling the system.
Place the system exactly as the system plan drawing shows. Remember that the testhead will be
rotated up for service and that cable length will be critical.
Immobilizing and Leveling the System
Immobilize and level all bays by screwing the leveling feet down to the floor. The testhead may be
difficult to unlock or rotate if it is not level.
If local building codes require equipment to be anchored to the floor due to potential seismic activity
(earthquakes), you will need to bolt the system to the floor. The shipping brackets used to secure the
system to the pallet are suitable for this purpose, but you will need to supply fasteners suitable for
your situation.