9018-18076.pdf.pdf - 第71页

Receiving an d Moving Instruct ions 8 Site Preparation 8-5 Re-shipping a System When it becomes necessary to pack and ship a syst em to anot her location, Keysight can help. You can either purchase a Keysight Move, which…

100%1 / 71
Receiving and Moving Instructions 8
Site Preparation 8-3
Uncrating the System and Support Bay
The customer should remove the tri-wall box from the pallet. The Keysight representative will uncrate
the system pallets. Leave the smaller boxes intact for the Keysight representative to unpack when the
system is installed.
Follow the uncrating instructions in Uncrating the i3070.
8-4 Site Preparation
8 Receiving and Moving Instructions
Placing the System
Moving the Testhead and Support Bay
Make sure all leveling feet are turned up as high as they go before rolling the system.
Place the system exactly as the system plan drawing shows. Remember that the testhead will be
rotated up for service and that cable length will be critical.
Immobilizing and Leveling the System
Immobilize and level all bays by screwing the leveling feet down to the floor. The testhead may be
difficult to unlock or rotate if it is not level.
If local building codes require equipment to be anchored to the floor due to potential seismic activity
(earthquakes), you will need to bolt the system to the floor. The shipping brackets used to secure the
system to the pallet are suitable for this purpose, but you will need to supply fasteners suitable for
your situation.
Receiving and Moving Instructions 8
Site Preparation 8-5
Re-shipping a System
When it becomes necessary to pack and ship a system to another location, Keysight can help. You can
either purchase a Keysight Move, which includes Keysight personnel disassembling, packing,
shipping, and setting up the system at the new location; or you can purchase a shipping kit from
Keysight which includes the pallet and other materials required to ship a system.
See “Re-Shipping Kits” under Parts in the online help for the shipping kit part numbers.
When re-shipping a support or instrument bay, do not use the ramp to move the bay
onto the pallet to avoid possible injury due to the bay tipping over on you. The ramp
is designed for removal of the bay only. Instead, use a hoist and attach to the hooks
on the top of the bay and lift the bay onto the pallet.