00198045-01_OM_BulkFeeder_X_EN.pdf - 第34页
SIPLACE BulkFeede r X / Operating Ma nual 05/2017 Edition 34 5.3 Feeding Compone nts Prerequisites: – The feeder has been s et up as describe d in section 5.1 Setting Up the Feed er . – The feeder has been c alibrated as…

SIPLACE BulkFeeder X / Operating Manual 05/2017 Edition
33
Figure 5-4: Performing calibration steps
All tables with SIPLACE BulkFeeder X feeders on the selected locations are now calibrated, i.e. the
two fiducials are measured to determine the table position in the machine. After that, the feeder
position itself is detected and so also the glass plate position. Then the height calibration is
performed during which four points on the glass plate are measured. Finally, the position of the
internal feeder camera is calibrated, i.e. the offset between feeder camera and board camera.
When all calibration steps have been successfully performed, click on Accept to finish the ►
calibration.

SIPLACE BulkFeeder X / Operating Manual 05/2017 Edition
34
5.3 Feeding Components
Prerequisites:
– The feeder has been set up as described in section 5.1 Setting Up the Feeder.
– The feeder has been calibrated as described in section 5.2 Calibrating the Feeder.
The feeder is now ready for placement.
On the station computer, download the current job from SIPLACE Pro. ►
Load the first board and start the placement process. ►
If the Cartridge has to be refilled during placement:
Unlock the Cartridge as described in section 5.5.1 Unlocking the Cartridge. ►
Remove the Cartridge from the Base Unit. ►
The Base Unit remains on the changeover table!
NOTICE
One component type per Cartridge
The Cartridge can only be filled with one component type. It is not possible to reset the
Cartridge to be filled with another component type.

SIPLACE BulkFeeder X / Operating Manual 05/2017 Edition
35
5.4 Replacing the Cartridge on the Base Unit
If the Cartridge can be replaced during placement:
Unlock the Cartridge as described in section 5.5.1 Unlocking the Cartridge. ►
Remove the Cartridge from the Base Unit. ►
Insert the new Cartridge. ►
The stopper on the bottom side
of the Cartridge has to hook into
the stopper on the Base Unit.
Position the filled Cartridge ►
on the Base Unit with the
filling funnel towards, hook it
into the stopper and push it
forwards.
Ensure that the Cartridge ►
locks correctly in the Base
Unit.
The Cartridge vibrates and the container shutter opens. The setup verification is automatically
performed. The glass plate vibrates to ensure it is empty and a reference run of the empty glass
plate (SIPLACE Vision image) starts.
NOTICE
Reference run
The reference run of the empty glass plate is always performed after a feeder or a
Cartridge has been exchanged.