4OM-1064-001.pdf - 第35页
1-25 Fig. 1.28 PCB Positioning Section 9. Maintenance (Every 6 Months) 0004-002 Tg0249-PM-MM Fig. 1.27 PCB Positioning Section Linear Guide Cleaning and Lubrication (DE1) (1) W ipe off old grease with an oiled rag. Note:…

1-24
Table 1.9
9. Maintenance (Every 6 Months)
Notes: (a) Grease Symbols
DE1 : DAPHNE EPONEX GREASE No.1
NM1 : NEW MOLYNOC GREASE No.1
KS64 : SILICONE GREASE KS64
(b) If SILICONE GREASE KS64 (SHIN-ETSU CHEMICAL CO.) is not
available, use grease specified as follows.
Fluorine Type Grease, BARRIERTA IEL/V (NOK KLUBER)
When BARRIERTA IEL/V is used, gently wipe grease over spots to be
lubricated.
9. Maintenance (Every 6 Months)
0004-002 Tg0249-PM-MM
Maintenance Spots Check
Name
Fig.
No.
Description Grease
Cleaning
Tools,
Nozzles, etc.
PCB Positioning
Section
Linear Guide 1.27 Cleaning and
Lubrication
DE1 Oiled Rag,
Hand or
Brush
Ball Spline
4 places
1.28 Cleaning and
Lubrication
DE1 Oiled Rag,
SPK-3C
Conveyor Linear Guides
(4 nipples)
1.29 Cleaning and
Lubrication
DE1 Oiled Rag, U
and N Types
Ball Screws and Nut 1.29 Cleaning and
Lubrication
DE1 Oiled Rag,
Hand or
Brush
Splines 1.29 Cleaning and
Lubrication
NM1 Oiled Rag,
Hand or
Brush
X-Axis
Side of Cable
1.30 Cleaning and
Lubrication
KS64 Oiled Rag,
Hand or
Brush
X-Axis
Cable Fixing Position
1.30 Checking
X-Axis
Upper/Lower Cable
Guides
1.30 Cleaning and
Lubrication
KS64 Oiled Rag,
Hand or
Brush
Y-Axis
Side of Cable
1.31 Cleaning and
Lubrication
KS64 Oiled Rag,
Hand or
Brush
Y-Axis
Cable Fixing Position
1.31 Checking
X/Y Beam
(Beams A and B)
Y-Axis
Lower Cable Guide
1.31 Cleaning and
Lubrication
KS64 Oiled Rag,
Hand or
Brush

1-25
Fig. 1.28 PCB Positioning Section
9. Maintenance (Every 6 Months)
0004-002 Tg0249-PM-MM
Fig. 1.27 PCB Positioning Section
Linear Guide
Cleaning and Lubrication (DE1)
(1) Wipe off old grease with an oiled
rag.
Note: Take care not to leave
any waste thread.
(2) Apply new grease by hand or with
a brush.
Ball Spline
Cleaning and Lubrication (DE1)
(1) Wipe off old grease with an oiled
rag.
Note: Take care not to leave
any waste thread.
(2) Lubricate the 4 nipples with new
grease from a grease gun.
Notes: (a) For the lubrication
procedure, refer to
“10.1 Placement
Head and P.C.B. Po-
sitioning Section”.
(b) The attachment to
be used is SPK-3C.
SPK-3C
Beam A Side
Beam B Side
Beam A Side
Beam B Side
Nipple
Nipple
Nipple
Nipple
Nipple

1-26
Fig. 1.29 Conveyor (Reference Point : FRONT)
9. Maintenance (Every 6 Months)
0004-002 Tg0249-PM-MM
Linear Guide
Cleaning and Lubrication (DE1)
(1) Wipe off old grease with an oiled rag.
Note: Take care not to leave any waste thread.
(2) Lubricate the 4 nipples with new grease from a grease gun.
Note: The attachments to be used are U type and N type.
U Type N Type
Ball Screws
Cleaning and Lubrication (DE1)
(1) Wipe off old grease with an oiled rag.
Note: Take care not to leave any waste thread.
(2) Apply new grease by hand or with a brush.
Splines
Cleaning and Lubrication (NM1)
(1) Wipe off old grease with an oiled rag.
Note: Take care not to leave any waste thread.
(2) Apply new grease by hand or with a brush.
Beam A Side
Beam B Side
Nipple
Nipple
Nipple
Nipple
Fixed Chute
Fixed Chute
L Conveyor
R Conveyor
Spline
Ball Screw
Movable Chute
Nipple
Nipple
Movable Chute
Nipple
Linear Guide
Nipple