YSM10_Mainte_E.pdf - 第39页

The instruction manual of this machine is written for those who operate this machine. Please read this manual carefully for correct operations and pay special attention to safety precautions. After reading through this m…

100%1 / 153
2. Nozzle leaf springs 6-3
2.1 Replacing nozzle leaf springs 6-3
3. Head unit 6-5
3.1 Replacing the valves 6-5
4. Conveyor 6-7
4.1 Replacing the conveyor belt 6-7
Appendix
1. Specifications A-1
1.1 Air regulator unit A-1
1.2 Power connection terminals A-2
1.3 Connection between machines A-3
1.3.1 PREVIOUS INTERFACE connector A-3
1.3.2 NEXT INTERFACE connector A-4
2. Maintenance parts A-6
2.1 YSM10 main unit maintenance parts list A-6
2.2 sATS15 maintenance parts list A-10
The instruction manual of this machine is written for those who operate
this machine.
Please read this manual carefully for correct operations and pay
special attention to safety precautions.
After reading through this manual, please use this manual as an
occasional reference and keep it within reach.
Introduction
Contents
1. Contents of each chapter i
2. Maintenance list ii
i
Introduction
1. Contents of each chapter
This manual is comprised of the following chapters.
Chapter 1 Maintenance
Describes operating conditions and environments necessary to maintain the machine performance, and the importance
of the daily check work and cleaning work. Setups to make before starting maintenance work, consumable parts and
maintenance tools as well as the necessary tools are also described.
Chapter 2 Daily maintenance items
Making checks and cleaning the machine are essential daily maintenance tasks for maintaining equipment performance.
Performing these tasks prevents unforeseen trouble and allows using the machine in an optimum state.
Chapter 3 Periodic maintenance items
Describes maintenance tasks that should be performed periodically to maintain equipment performance. According to
the contents of the maintenance items, recommended maintenance intervals are available, such as "weekly", "monthly",
"3-month", "6-month", "1-year" and "2-year".
Chapter 4
Maintenance of options
Describes the maintenance work of YSM10 main unit options (sATS15, ionizer, UPS and nozzle station).
Chapter 5
Lubrication Points & Schedule
Provides information regarding the lubrication points, lubrication tools, and the lubrication schedule for the axes
described in section 3 "Periodic Inspections".
Chapter 6 How to replace consumable parts
Describes how to replace the consumable parts, such as nozzle leaf springs or the replacement parts, such as valves.
w
WARNING
ALWAYS THOROUGHLY READ “SAFETY INSTRUCTIONS” STATED AT THE BEGINNING OF THIS DOCUMENT BEFORE STARTING
THE MAINTENANCE WORK.