3 Preliminary Work on the SIPLACE X-Series Assembly Instructions 3.2 Routing and Connection of the Limit Switch Cabl e SIPLACE X-Series Produc tivity Shuttle T ype I/II 10 3.1.1 Required Part Cable/limit switch for XPL, …

9
Assembly Instructions 3 Preliminary Work on the SIPLACE X-Series
SIPLACE X-Series Productivity Shuttle Type I/II 3.1 Preparation for Installing the XPL
3 Preliminary Work on the SIPLACE
X-Series
To install the SIPLACE X-Series Productivity Lane (XPL) in the SIPLACE X-Series, the following
preliminary work must be carried out on the placement system.
NOTE
Always refer to the operating and assembly instructions of the placement system in this regard.
1. Position the fixed walls of the SIPLACE X-Series at the outside-outside.
2. Set the transport width of the SIPLACE X-Series to 100 mm.
3. Switch off the SIPLACE X-Series at the main switch, and unplug and disconnect the power
supply.
4. Remove the covers at the inlet and outlet of the placement system. This will enable easier
installation of the XPL later on.
5. Remove the lifting table plates in placement area 2.
6. Remove the cover of the main distributor of the conveyor control.
3.1 Preparation for Installing the XPL
A limit switch of the XPL must be connected to the main distributor of the conveyor control of the
SIPLACE X-Series. For this purpose, the relevant cable must be connected and routed as follows.

3 Preliminary Work on the SIPLACE X-Series Assembly Instructions
3.2 Routing and Connection of the Limit Switch Cable SIPLACE X-Series Productivity Shuttle Type I/II
10
3.1.1 Required Part
Cable/limit switch for XPL, Part number: 03065827-01
3.2 Routing and Connection of the Limit Switch Cable
7. Insert the cable for the SIPLACE X-Series onto the X7KU contact of the conveyor control.
X7KU transport control

11
Assembly Instructions 3 Preliminary Work on the SIPLACE X-Series
SIPLACE X-Series Productivity Shuttle Type I/II 3.2 Routing and Connection of the Limit Switch Cable
8. Route the cable in the shaft below the carrier unit of the intermediate conveyor of the SIPLACE
X-Series.
9. The connection to the XPL is made after the XPL is installed (see Chapter 4.2 Making Electrical
Connections).
10.Reinstall the cover over the main distributor of the conveyor control.
11.Before the lifting table plates can be reinstalled, the pneumatic cylinders of both lifting tables
must be depressurized and the linkage of the lifting tables must be lifted slightly.
12.Reinstall the lifting table plates in placement area 2.
Introduce cable into
the shaft via the cable
duct.
Guide cable through
the shaft. It will be
connected to the XPL
on the other side after
the XPL is installed.