ISM-2000_OPE.pdf - 第38页
Software 3.1 rev_0 1 Edition 06/20 16 - Reproduction forbidden a Page 38 Storage Solut ions Soft ware Operating Manual It allows to release, or keep related, the reels to the production line, a t the commit of the sessio…

Software 3.1 rev_01 Edition 06/2016 - Reproduction forbidden
a
Page 37
Storage Solutions Software Operating Manual
Here you can name your extraction queue and write any needed notes.
You can also decide, by marking the “Start extraction” check box, if automatically start the
queue
or not.
NOTE: In the “EXTRACTION MANAGEMENT” window, you can insert into the “Empty reel
code”, the code of the empty unique ID (you can also read the code by using the manual
barcode reader).
Pressing on “next reel”, the software will automatically select the correct “stock” reel to
extract.
10. Once the session is finished, you can close the session by pressing the button
The following window will be displayed:
The software will display the list of the reels have been used during this production. There will
be the possibility to check the empty reels by reading the barcode, or easily pressing the button
“Select empty” will be select all reels with quantity “0” that will be deactivated.
It allows to change the quantity of items into the reel if there are some differences from the
calculated remaining quantity and the real one.
It allows to add a missing reel even if the session is already started.

Software 3.1 rev_01 Edition 06/2016 - Reproduction forbidden
a
Page 38
Storage Solutions Software Operating Manual
It allows to release, or keep related, the reels to the production line, at the commit of the
session.
It allows to commit the session, confirming to detract the number of component used for each
unique ID.
Those two fields are used only with the THT option activated, and in only in case of
“
partial
use
”
unique IDs.
11. If is needed to abort a session, simply press the button
. At this point, will be appear a new window:
If you press “YES”, the program will ask you if you like to create a new copy of the session:
You can start the copy of the aborted session at any time.

Software 3.1 rev_01 Edition 06/2016 - Reproduction forbidden
a
Page 39
Storage Solutions Software Operating Manual
1) Planner:
The planner will allow you to start new session for the different P&P lines, and moreover will
allow you to pre-prepare a new setup, merging it with an existing on:
1. Press the button, and drag a new session over an existing one.
The MANAGE SESSION window will be displayed, and you can make the pre-analysis
by pressing the Pre-analysis button:
Note: all rows marked with the symble are the reel codes that are already in use in
“mother” session, and that are now linked with the new one.