CP-842E-842ME Operator's Guide-Preliminary-CP842-10E.pdf - 第78页
It is possible to operate a servo control axis via a manual operation. This oper- ation is called "inching". Procedure 1. Select [JOG…] from the command bar at the bottom of any screen. 2. Select the desired ax…

Chapter 8
Production Support Functions
8.1 Manual Operation of Servo Control Axes
8.2 Setting the Production Start Sequence
8.3 Loading a New Panel
8.4 Unloading Panels From the XY-table
8.5 Unloading All Panels
8.6 Moving to the Panel Loading/Unloading Position on the XY-Table
8.7 Panel Lifter Up/Down
8.8 Main Conveyor Clamping/Unclamping
8.9 Step Mode Panel Loading
8.10 Loading Panels to In-Carrier
8.11 Loading Panels to the Main Conveyor
8.12 Unloading Panels to the Out-Carrier
8.13 Unloading Panels to the Out-Lifter
8.14 Clearing the Production Quantity Count
8.15 Skipping Boards
8.16 Pass Mode Operation
8.17 Nozzle Skip
Preliminary
8-1CP-842E/842ME Operator’s Guide

It is possible to operate a servo control axis via a manual operation. This oper-
ation is called "inching".
Procedure
1. Select [JOG…] from the command bar at the bottom of any
screen.
2. Select the desired axis from the [Select Axis Set] section.
3. Move the servo axis as desired using the inching keys.
Note: Rapid inching can be performed by holding down the [F] key while
pressing the appropriate arrow key.
Changing the Rapid Inching Speed
Procedure
1. Select [JOG…] from the command bar at the bottom of any
screen.
2. Select the desired axis from the [Setting Speed] section.
3. Use the numeric keypad to input the speed (expressed as a per-
cent of the full speed of the servo axis).
Note: The inching speed cannot be changed by more than 5%.
4. Then press [OK].
8.1 Manual Operation of Servo Control Axes
Chapter 8: Production Support Functions
Preliminary
8-2 CP-842E/842ME Operator’s Guide

It is possible to set the sequence from which production is to start. This oper-
ation must be carried out with the panel on the XY-table.
Procedure
1. Select [Production] from the [Main] screen.
2. Then select [Start Sequence].
3. Select [Production Start Number].
4. Use the numeric keypad to input the number of the sequence
from which production is to start.
5. Press the START button.
Note: If fiducial mark acquisition has not been completed for the panel on the
XY-table, production will start from the specified sequence but after the
fiducial marks are read.
8.2 Setting the Production Start Sequence
Chapter 8: Production Support Functions
Preliminary
8-3CP-842E/842ME Operator’s Guide