00191021-02.pdf - 第141页

User’s Manual Test Program S ITEST 4 Mapping Software Version 403.xx Edition 07/97 4.1 Preparatory Steps for the Mapping Operation 4 - 3 4.1 Preparatory Steps for the Mapping Operation ● In th e mai n view c lick on the …

100%1 / 178
4 Mapping User’s Manual Test Program SITEST
Software Version 403.xx Edition 07/97
4 - 2
User’s Manual Test Program SITEST 4 Mapping
Software Version 403.xx Edition 07/97 4.1 Preparatory Steps for the Mapping Operation
4 - 3
4.1 Preparatory Steps for the Mapping Operation
In the main view click on the Overall reference run button to perform a reference run of all gantry and
head axes.
Manually slide the PCB stopper to the center of the conveyor width.
Place the mapping plate onto the center conveyor.
NOTE
For RV and IC mapping a mapping plate with a dark, dull surface must be used.
In the case of dual conveyors, mapping must be performed for the right and left conveyor tracks.
CAUTION
!
On no account must the PCB clamping mechanism be actuated during PCB mapping
. If the glass map-
ping plate for PCB mapping is clamped, it may be damaged so severely, that it cannot be used any more.
4 Mapping User’s Manual Test Program SITEST
4.1 Preparatory Steps for the Mapping Operation Software Version 403.xx Edition 07/97
4 - 4