00191021-02.pdf - 第155页
User’s Manual Test Program S ITEST 4 Mapping Software Version 403.xx Edition 07/97 4.1 Preparatory Steps for the Mapping Operation 4 - 3 4.1 Preparatory Steps for the Mapping Operation ● In th e mai n view c lick on the …

4 Mapping User’s Manual Test Program SITEST
Software Version 403.xx Edition 07/97
4 - 2

User’s Manual Test Program SITEST 4 Mapping
Software Version 403.xx Edition 07/97 4.1 Preparatory Steps for the Mapping Operation
4 - 3
4.1 Preparatory Steps for the Mapping Operation
●
In the main view click on the Overall reference run button to perform a reference run of all gantry and
head axes.
●
Manually slide the PCB stopper to the center of the conveyor width.
●
Place the mapping plate onto the center conveyor.
NOTE
For RV and IC mapping a mapping plate with a dark, dull surface must be used.
In the case of dual conveyors, mapping must be performed for the right and left conveyor tracks.
CAUTION
∆
!
On no account must the PCB clamping mechanism be actuated during PCB mapping
. If the glass map-
ping plate for PCB mapping is clamped, it may be damaged so severely, that it cannot be used any more.

4 Mapping User’s Manual Test Program SITEST
4.1 Preparatory Steps for the Mapping Operation Software Version 403.xx Edition 07/97
4 - 4