00197674-01-UM-E-Series-EN-12-2014.pdf - 第302页

7 Cleaning and Checking User manual SIPLACE E 7.2 Cleaning and Checking Intervals SIPLACE CP14 P From software version SC 708.0 12/2014 Edition 302 7.2 Cleaning and Checking Intervals SIPLACE CP14 P 7 Cleaning and C heck…

100%1 / 308
User manual SIPLACE E 7 Cleaning and Checking
From software version SC 708.0 12/2014 Edition 7.1 Cleaning and Checking Intervals Base Machine
301
7
7
7
a) This value is for 3 shift operation (7500 hours of operation). Longer intervals can be planned for other operation setups.
Cleaning and Checking tasks
Component Docking Unit
Duration
[min]
Each
week
Every 3
months
Every 6
months
Every 12
months
Function Test of Used Tape Cutter
2X
Greasing the Tape Cutter
5X
Greasing the Cutting Blade
2X
Greasing the COT Insert
1X
Greasing the Locator Bearing on the Component Trol-
ley for SIPLACE SmartFeeder E
1X
Cleaning and Checking tasks
Optical systems
Duration
[min]
Each
week
Every 3
months
Every 6
months
Every 12
months
Cleaning the IC and FC Cameras
4X
Cleaning the PCB Barcode Scanner
*a
2X
*)a If availible
Cleaning and Checking tasks
Vacuum pump
Duration
[min]
Each
week
Every 3
months
Every 6
months
Every 12
months
Checking/Replacing the Filter Insert
15 X
a
7 Cleaning and Checking User manual SIPLACE E
7.2 Cleaning and Checking Intervals SIPLACE CP14 P From software version SC 708.0 12/2014 Edition
302
7.2 Cleaning and Checking Intervals SIPLACE CP14 P
7
Cleaning and Checking tasks
SIPLACE CP14
Duration
[min]
Each
week
Every 3
months
Every 6
months
Every 12
months
Preparing the Placement Head
5X
Replacing the Pressure Control Valve
3X
Cleaning the Z Axis
6X
Oiling the DP Segment Guide
15 X
Oiling the Z Axis Linear Guide
3X
Oiling the DP Driver Bearing
4X
Checking/Replacing the Vacuum-Conducting Parts
Reflecting ring and cover
or 7
Holding circuit and silencer
5X
Cleaning the Raceway and the Jaw
2X
Replacing the Filter Disks
15 X
Checking/Cleaning/Replacing the Switching Disks
1 x X
Cleaning the Component Sensor
1X
User manual SIPLACE E 7 Cleaning and Checking
From software version SC 708.0 12/2014 Edition 7.3 Cleaning and Checking Intervals SIPLACE TH/PP
303
7.3 Cleaning and Checking Intervals SIPLACE TH/PP
7
7.4 Cleaning and Checking Intervals SIPLACE CP12/CP6
7
Cleaning and Checking tasks
SIPLACE TH/PP
Duration
[min]
Each
week
Every 3
months
Every 6
months
Every 12
months
Preparing the Placement Head
5X
Replacing the Pressure Control Valve
3X
Cleaning the Sleeve and Nozzle Seat
2X
Cleaning/Replacing the Additional Volume Filter
2X
Cleaning and Checking tasks
SIPLACE CP12/CP6
Duration
[min]
Each
week
Every 3
months
Every 6
months
Every 12
months
Removing the Valve Plungers
2/4 X
Cleaning the Valve Casings
1/2 X
Cleaning the Valve Plungers
3/6 X
Greasing the Valve Plungers
3/6 X
Inserting the Valve Plungers
2/4 X
Checking, Cleaning and Greasing the Sleeves
20/40 X
Cleaning the Turning Station Read Unit
2/2 X
–Z axis:
Clean the toothed belt
Clean the rollers and toothed wheels
Check the toothed belt
Grease the toothed belt
Check the Z axis guide
Check the jaws
Grease the Z axis guide
6/6 X